AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) REQUIREMENTS <br /> Consultant's Reporting ObLgations under 2009 ARRA Federal Stimulus Funding <br /> [Note: The Monthly Employment Report form. and Reporting Instructions are incorporated from <br /> the Internet at the hyperlinks provided below in these ARRA related provisions. Agency. may <br /> revise the form and/or reporting instructions if revisions are determined necessary by the federal <br /> funding agency or other federal agency responsible for production of the form and instructions; <br /> and they shall become part of the WOC .when revised and posted by Agency without an <br /> amendment to the WOC. Consultant shall report using the most current form and reporting. <br /> ~ instructions provided by Agency.j- <br /> This project includes American Recovery & Reinvestment Act (ARRA) funding. States must <br /> collect and analyze certain employment data for each ARRA funded contract. <br /> ;The prime. Consultant shall complete a separate Monthly Employment Report for each ARRA <br /> `project once each month from the date of the Notice to Proceed until completion of the WOC. <br /> Consultant shall provide, aggregated on one form per project, the required information for their <br /> own workforce as well as the workforce of all subcontractors (including all sub-tiers) that were <br /> active on their ARRA funded ro'ect s for the re ortin month. <br /> P J O <br /> P g <br /> <br /> i <br /> Consultant's timely, complete; accurate, and truthful compliance with the reporting obligations <br /> constitutes a material component of the Consultant's performance of this WOC. Agency may <br /> withhold any amounts otherwise due to the Consultant under this WOC until the Consul"tant has <br /> submitted any report that is late. <br /> Due date: Reports are due within 10 calendar days after the end of every month until project <br /> completion or until September 2012, which ever is sooner. <br /> Due to: Reports must be emailed to ARRAreporting{a~odot.state.or.us with a copyto the <br /> Project Manager, Project Leader, or Local Agency Liaison. (Agency may require <br /> .report submittal via website interface if a web-based interface is established.) <br /> Monthly Employment Report Form and Instructions. <br /> The monthly ARRA Employment report for each project must include all required information <br /> as stated on the Reporting Instructions. The monthly ARRA Employment Report form and <br /> .Reporting Instructions, which may be revised from time to time, are available for download from <br /> the Internet. (at the hyperlinks provided below) and are incorporated into this WOC with the <br /> same force and effect. as if fully set forth herein. For each monthly report, it is the Consultant's <br /> responsibility to confirm they are using the then most current form and instructions by reviewing <br /> them at the following hyperinks: <br /> o Employment Report Form - <br /> ftp://ftp.odot.state.or.us/techserv/construction/Construction%20Forms/ARRAI2763(ARRA) xls <br /> o Reporting Instructions - <br /> ftp://ftp.odot.state.or. us/techserv/construction/Construction%20Form s/ARRA/2763(ARRA1 I nstru <br /> ction.gdf <br /> <br />