New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 4638 Gelco 2010-00004
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN 4638 Gelco 2010-00004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:34:35 PM
Creation date
8/11/2009 11:46:14 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004638
GL_Project_Number
995305
Identification_Number
2010050077
COE_Contract_Number
2010-00004
Retention_Destruction_Date
11/17/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF EUGENE <br /> PROPOSAL <br /> JUNE 30, 2009; 2:U0 PM: JOB #4638 BID NUMBER 22 <br /> TO THE CITY MANAGER BIDDER: F l~c~ e o ~ s vL~`o N ~o <br /> .EUGENE, OREGON <br /> The undersigned Bidder declares: <br /> That Bidder has carefully examined and incorporates in this Proposal, by this reference all documents included <br /> in the Book of Contract Documents and Specifications for this job which includes but is not limited to the Plans; City <br /> Standard Specifications and Standard Drawings, Supplemental Specifications'and Special Provisions, and City of <br /> Eugene <br /> .Amendment #1, Addenda, Bid Schedule, Prevailing Wage Rates, Contract Form, and Bond Form for <br /> 2009 WASTEWATER PIPE REPLACEMENT <br /> BASINS DC31, DC32, DW14, AND DWTS AT VARIOUS LOCATIONS IN THE. CITY <br /> CAPITAL IMPROVEMENT PROJECT- <br /> That Bidder has made an examination of the site of the proposed work and has made such investigations as are <br /> necessary to determine the character of the material and the conditions to be encountered, independently ofthe indication <br /> on the plans; and that if the Proposal is accepted, Bidder will contract with the City of Eugene as provided in the,Contract. <br /> Form, will to the extent of this bid, provide the necessary. machinery, tools, apparatus, and other means of construction, <br /> <br /> . and will fiunish all material and labor as specified, or called. for by the Plans or necessary to complete the work in the <br /> manner specified. and in accordance with the requirements of the Engineer. . <br /> The undersigned also agrees thatBidder will order all material and equipment included under this contract and <br /> will commence work within five (5) days after receipt of Notice to Proceed and that Bidder will complete the work in all <br /> respects after commencement and will have the project completed as specified in the Special Provisions and that Bidder <br /> will pay as liquidated damages to the City for any delay as specified in the Special Provisions. <br /> PROPOSAL -JOB #4638 PAGE 1 of 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.