New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 4378 Mowat 2010-00003
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN 4378 Mowat 2010-00003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 1:53:46 PM
Creation date
8/11/2009 11:46:07 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004378
GL_Project_Number
965132
Identification_Number
2010050075
COE_Contract_Number
2010-00003
Retention_Destruction_Date
4/19/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The undersigned Bidder has heretofore completed the following work of a similar nature to that contemplated. <br /> JOB LOCATION DATE <br /> Springwater Trail Pedestrian Bridges Milwaukie, OR Summer 20Q5-Fall 2006 <br /> I-5 Beltline- Ped Bridge Over l-5 Eugene, OR Winter 2007-Summer 2008 <br /> The undersigned Bidder acknowledges that the amount of damages City might suffer by reason ofa failure to <br /> complete the project by the completion date noted above would be difficult or impossible to compute, and therefore <br /> ~ agrees that the stipulated amount of liquidated damages set forth above for such delay is a fair and reasonable measure of <br /> ' damages, and therefore Bidder agrees that it will not contest such sum as being other than a true measure of damages in <br /> the event of a failure to complete the project by the stipulated completion date. Bidder hereby declares and agrees: <br /> . (1) that the provisions of ORS 279C.800 to 279C.870 pertaining to prevailing wage rates shall be <br /> complied with; <br /> (2) that where asbestos abatement is required the abatement shall be done by Department of Environmen- <br /> ~ tal Quality certified workers and the abatement shall be performed in conformity with DEQ and OSHA <br /> i <br /> ' regulations and other standards related to work place safety; <br /> (3) that Bidder is X is not a Resident Oregon Bidder, as defined by ORS 279A:120. "Resident <br /> { <br /> Bidder" means a Bidder that has.paid unemployment taxes or income taxes in this state during the 12- ' <br /> calendar months immediately preceding submission of the bid, has a business address in this state, and <br /> ~ has stated in the bid whether the Bidder is a "Resident Bidder;" <br /> (4) that Bidder shall comply with and cause its subcontractors to comply with all applicable provisions of <br /> <br /> •i <br /> ~ federal, state and local statutes, ordinances, rules and regulations. <br /> This bid is incomplete and shall not be considered unless there is attached hereto a signed complete original of <br /> the Affidavit ofNoncollusion, Bid Schedule, all Addenda plus a Certified Check, Cashier's Check or Bidder's Bond; First- <br /> 'tier Subcontractor Disclosure Statement, and Certificate of Bidder/Contractor of Employees Drug.Testing Policy, <br /> Certificate ofNon-Discrimination in Sub-Contracting. <br /> ' Submitted by: Mowat Construction Company <br /> Name of Bidder Mowat C n uc n Co an <br /> Signature of Authorized Agent <br /> Title John P. andstrom President <br /> Business Address of Bidder PO BOx 1330, Woodinville,. WA 98072-1330 <br /> Phone 425.398.0205. <br /> Date June 24, 2009 <br /> P OPOSAL -JOB #4378 PAGE 3 of 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.