i <br /> HEATING PLANT: Temporary Heating <br /> Plant Operator; LOADERS: Bobcat, skid steer (less than 1 cu <br /> yd.); Bucket Elevator Loader Operator, BarberGreene and <br /> _ similar types; OILERS: Oiler; Guardrail Punch Oiler:; Truck <br /> Crane Oiler- Driver; Auger Oiler; Grade Oiler, required to <br /> check grade; Grade Checker; PIPELINE-SEWER WATER: Tar Pot <br /> Fireman; Tar Pot Fireman (power agitated); PUMPS: Pump <br /> Operator (any .power); Hydrostatic Pump Operator; RAILROAD <br /> i_ EQUIPMENT: Brakeman; Oiler; Switchman; Motorman; Ballast <br /> Jack Tamper -0perator; SHOVEL, DRAGLINE, CLAMSHELL, SKOOPER, <br /> ETC. OPERATOR: Oiler, Grade Oiler (required to check <br /> I grade); Grade Checker; Fireman; SWEEPER: Broom .operator, <br /> self propelled, " <br /> construction job site; SURFACING (BASE) MATERIAL: Roller <br /> Operator, grading of base rock (not asphalt); Tamping <br /> Machine operar"tor; mechanical, self-propelled; Hydrographic <br /> Seeder Machine Operator; TRENCHING MACHINE: Oiler; Grade <br /> ~ Oiler; TUNNEL: Conveyor operator; <br /> Air filtration equipment operator <br /> i <br /> FOOTNOTE C: <br /> HANDLING OF HAZARDOUS WAST MATERIALS - Personnel in all craft <br /> ! classifications subject to working inside a federally <br /> designated Hazardous Waste perimeter shall be eligible for <br /> compensation in accordance with the following group <br /> schedule relative to the level of Hazardous Waste as <br /> outline in the specific Hazardous waste Project Site Safety <br /> Plan: <br /> H-1 Base Wage Rate when on a hazardous waste site when not <br /> outfitted with protective clothing. <br /> H-2 Class "C" Suit - Basic hourly wage rate plus $1.00 per <br /> hour, fringes plus $0.15. <br /> H-3 Class "B" Suit Basic hourly wage rate plus $1.50 per <br /> hour, fringes plus $0.15. <br /> H-4 Class "A" Suit -Basic hourly wage rate plus $2.00 per <br /> Hour, fringes plus $0.15. <br /> IRON0029-004 07/01/2008 <br /> Rates Fringes <br /> <br /> ! IRONWORKER.. 31.65 17.87 <br /> <br /> I <br /> LABO0001-006 06/01/2007 <br /> Rates Fringes <br /> Mason Tender/Hod Carrier <br /> Tenders to Bricklayers, <br /> Tile Setters, Marble <br /> Setters and Terrazzo <br /> Workers, Topping for. <br /> Cement Finishers and <br /> Mortar Mixers 25.14 11.07 <br /> LABO0003-003 06/01/2007 <br /> OR20080002 06/05/2009 11 <br /> <br />