II <br /> All jobs or projects located more than 50 miles from the <br /> respective city hall of the above mentioned cities shall <br /> receive Zone III pay for all classifications. <br /> i POWER EQUIPMENT OPERATORS CLASSIFICATIONS <br /> GROUP 1: .CONCRETE: Batch Plant and/or Wet Mix Operator, three <br /> units or more; CRANE: Helicopter Operator, when used in <br /> erecting work; Whirley Operator, 90 ton and, over; LATTICE <br /> BOOM CRANE: Operator 200 tons through 299 tons, and/or over <br /> 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 <br /> tons through 199 tons with luffing or tower attachments; <br /> ~ FLOATING EQUIPMENT: Floating Crane, 150 ton but less than <br /> 250 ton <br /> I <br /> i GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and <br /> <br /> ~ over (with luffing or tower attachment); LATTICE BOOM <br /> CRANE: Operator, 200 tons through 299 tons, with over 200 <br /> feet boom; FLOATING EQUIPMENT: Floating Crane 250 ton and <br /> over <br /> <br /> i <br /> <br /> i <br /> GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 <br /> <br /> ~ tons with over 200 feet boom; Operator 400tons and over; <br /> FLOATING EQUIPMENT: Floating Crane 350 ton and over <br /> GROUP 2: ASPHALT: Asphalt Plant Operator (any type); Roto <br /> Mill, pavement profiler, operator, 6 foot lateral cut and <br /> over; BLADE: Auto Grader or "Trimmer" (Grade Checker <br /> <br /> j required); Blade Operator, Robotic; BULLDOZERS: Bulldozer <br /> operator over 120,000 lbs and above; Bulldozer operator, <br /> twin engine; Bulldozer Operator, tandem, quadnine, D10, D11, <br /> and similar type; Bulldozere Robotic Equipment (any type; <br /> CONCRETE: Batch Plant and/or Wet Mix Operator, one and two <br /> drum; Automatic Concrete Slip Form Paver Operator; Concrete <br /> Canal Line Operator; Concrete Profiler, Diamond Head; <br /> CRANE: Cableway Operator, 25 tons and over; HYDRAULIC- <br /> CRANE:.Hydraulic crane operator 90 tons through 199 tons <br /> (without luffing or tower attachment); TOWER/WHIRLEY <br /> OPERATOR: Tower Crane Operator; Whirley Operator, under 90 <br /> tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to <br /> 200 feet boom; CRUSHER: Crusher Plant Operator; FLOATING <br /> EQUIPMENT: Floating Clamshell, etc.operator, 3 cu. yds. <br /> and over; Floating Crane (derrick barge) Operator, 30 tons <br /> but less than 150 tons; LOADERS: Loader operator, 120,000 <br /> lbs. and above; REMOTE CONTROL: Remote controlled <br /> earth-moving equipment; RUBBER-TIRED SCRAPERS: Rubber- <br /> tired scraper operator, with tandem scrapers, multi-engine; <br /> SHOVEL, DRAGLINE, CLAMSHELL, SKOOPER OPERATOR: Shovel, <br /> Dragline, Clamshell, operator 5 cu. yds and over; TRENCHING. <br /> MACHINE: Wheel Excavator, under 750 cu. yds. per hour <br /> (Grade Oiler required); Canal Trimmer (Grade Oiler <br /> required); Wheel Excavator, over 750 cu. yds. per hour; <br /> Band Wagon (in conjunction with wheel excavator); <br /> UNDERWATER EQUIPMENT: Underwater Equipment Operator, remote <br /> or otherwise; HYDRAULIC HOES-EXCAVATOR: Excavator over <br /> 130,000 lbs.; HYDRAULIC CRANE: Hydraulic crane operator, 50 <br /> tons through 89 tons•(with luffing or tower attachment); <br /> OR20080002 06/05/2009 7 <br /> _ _ _ <br /> <br />