New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 4378 Mowat 2010-00003
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN 4378 Mowat 2010-00003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 1:53:46 PM
Creation date
8/11/2009 11:46:07 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004378
GL_Project_Number
965132
Identification_Number
2010050075
COE_Contract_Number
2010-00003
Retention_Destruction_Date
4/19/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J <br /> PREFACE <br /> i <br /> i <br /> The."Davis-Bacon Wage Determinations" and the Oregon Bureau of <br /> i <br /> Labor and Industries (BOL D "Prevailing Wage Rates for Public <br /> Works Contracts in Oregon subject to BOTH the State PWR and . <br /> federal Davis-Bacon Act" apply to this Project.. <br /> i <br /> The wage .rate. and fringe benefits listed in this "Davis-Bacon <br /> i <br /> I Wage Determinations for Highway Construction Projects" shall be <br /> paid unless a higher wage rate and fringe benefits is listed in <br /> I the Oregon Bureau of Labor and Industries (BOLD "Prevailing Wage <br /> Rates for Public Works Contracts in Oregon subject to BOTH the <br /> State PWR and federal Davis-Bacon Act", in which case, the higher <br /> wage rate and fringe benefits shall be paid (see ORS 279C.838). <br /> The BOLI publication is a separate document and is incorporated <br /> into this Project by reference. <br /> ~I <br /> i~ <br /> j~~ <br /> <br /> 1 <br /> j <br /> _ <br /> _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.