~ ~ ~ ~ lip I <br /> ~ ~ . <br /> ROOFER (Continued) TENDERS TO MASON TRADES (Brick and <br /> Stonemason, Mortar Mixer, Hod Carrier) <br /> Add $3.00 to basic hourly rate for employees (Continued) <br /> working with irritable bituminous materials <br /> Add to base rate an amount equal to that received for <br /> SHEET METAL WORKER safety belt requirements or other unusual job <br /> conditions by the mechanic this worker is tending. <br /> Area 1 33.27 16.05 <br /> TENDER TO PLASTERER AND•STUCCO <br /> <br /> 1 Add $1.00 to base rate for work performed on any MASON <br /> swinging platform, swuiging chair or swinging 23.62 11.00 <br /> ladder. <br /> TILE SETTER/TERRAZZO WORKER: Hard Tile <br /> Add $1.00 to base rate for work with lead or Setter 26.53 12.60 <br /> installing material in a plant that uses lead in any <br /> form to manufacture a product (excluding (This trade is tended by "Tile, Terrazzo, & Marble <br /> soldering). Finisher") <br /> i Add $1.00 to base rate for work performed in a TILE, TERRAZZO, AND MARBLE FINISHER <br /> confined space as defined by OSHA. <br /> TILE, TERRAZZO FINISHER <br /> Area 3 29.71 15.00 20.21 9.2'0 <br /> Add $1.00 to base rate for work where it is BRICK AND MARBLE FINISHER <br /> necessary to wear a chemically activated face 20.21 9.30 <br /> mask. <br /> Add $1.00 to base rate if safety belt required by State <br /> Area 4 29.00 14.53 safety regulations. <br /> Area 5 28.13 15.30 Add $1.00 to base rate if work involves epoxy, <br /> furnane, alkor acetylene black grouting or waterproof <br /> Area 1 Area 1 (Cont.) Area 5 membrane. <br /> Benton Washington Coos <br /> Clackamas Wheeler Curry TRUCK DRLVER <br /> Clatsop <br /> Columbia Area 3 Group 1 26.40 11.91 <br /> Gilliam Morrow Group 2 26.52 11.91 <br /> Grant Umatilla Group 3 26:65 11.91 <br /> j Lincoln Group 4 26.91 11.91 <br /> Linn Area 4 Group 5 27.13 11.91 <br /> Multnomah Douglas Group 6 27.29 11.91 <br /> Tillamook Lane Group 7 27.49 11.91 <br /> SOFT FLOOR LAYER 25.58 10.85 <br /> ,(Zone Pay in addition to Basic Hourly Rate and <br /> SPRINKLER FITTER 32.15 16.55 'Fringe.) <br /> TENDERS TO MASON TRADES (Brick and For the Following Cities: <br /> Stonemason, Mortar Mixer, Hod Carrier) <br /> Albany Grants Pass Ontario <br /> 25.14 11.00 Astoria Hermiston Oregon City <br /> Baker Hood River .Pendleton <br /> Add $0.50 to base rate for refractory work. Bend Klamath Falls Portland <br /> Bingen LaGrande Port Orford <br /> Brookings Lakeview Reedsport <br /> Burns Longview Roseburg <br /> <br />