Landing Pad <br /> Cost Estimate <br /> ' 7/14/2009 <br /> <br /> I! Excavation $2,000 <br /> Concrete pad 35'x35' $8,575 <br /> Concrete paths $1 260 <br /> Engineering $7,500 ~Ar <br /> Project Management $5,000 <br /> F~ <br /> . <br /> Electrical 3-20 am <br /> ( p) $3,000 <br /> Permits ~ <br /> $2,000 w <br /> Contingency $2,665 <br /> Land lights 8 000 <br /> (alter. Item, $1,000 for conduit) <br /> Total $40,000 <br /> ~ <br /> ~ ~ <br /> ¢ <br /> a <br /> r .F <br /> . <br /> ~ <br /> <br />