New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4581 4610 Knife River Contract 2010-00001
COE
>
PW
>
Admin
>
Finance
>
Capital
>
09 Street Bond Audit
>
GJN4581 4610
>
GJN4581 4610 Knife River Contract 2010-00001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:31:31 AM
Creation date
7/27/2009 12:08:00 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004581
GL_Project_Number
995334
Identification_Number
2010050055
COE_Contract_Number
2010-00001
Retention_Destruction_Date
11/29/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ELECTRICIAN (Continued) <br />(b) Those portions lying east of a line running North <br />and South from the NE ccorner of Coos County to <br />the SE corner of Lincoln County. <br />(c) South half <br />(d) North half <br />ELEVATOR CONSTRUCTOR INSTALLER <br />AND MECHANIC <br />Area 1 <br />Mechanic 41.91 16.29 <br />Area 2 <br />Mechanic 43.09 18.29 <br />Reference Cities <br />Area 1 Area 2 <br />Baker _ All <br />Umatilla Remaining <br />Union Counties <br />Wallowa <br />FLAGGER See Laborer, Group 5 <br />GLAZIER 30.30 14.33 <br />Add $1.00 to base rate if safety belt is required by <br />State safety regulations. <br />Add $4.00 to base rate for work done from anon- <br />motorized single-man bosun chair. <br />HIGHWAY/PARKING STRIPER <br />28.27 8.27 <br />IRONWORKER 31.65 16.37 <br />Zone Differential for Ironworker <br />(Add #o Basic Hourly Rate) <br />Zone 1 0.00 <br />Zone 2 3.75 hr. or $30.00 maximum per day <br />Zone 3 6.88 hr. or $55.00 maximum per day <br />Zone 4 8.75 hr. or $70.00 maximum per day <br />IRONWORKER (Continued) <br />Zone 1: Projects within 45 miles of city hall in the <br />cities listed below. <br />Zone 2: More than 45 miles, but less than 60 miles. <br />Zone 3: More than 60 miles, but less than 100 miles. <br />Zone 4: More than 100 miles. <br />Note: Zone pay for Ironworkers shall be determined using <br />AAA road mileage .computed from the city hall of the <br />reference cities listed below or the residence of the <br />employee, whichever is nearer to the project. <br />Reference Cities <br />Medford Portland <br />LABORER <br />Zone 1 (Base Rate <br />Group 1 24.66 11.15 <br />Group 2 25.29 11.15 <br />Group 3 25.75 11.15 <br />Group 4 26.15 11.15 <br />Group 5 21.51 11.15 <br />Note: A Hazardous Waste Removal Differential must be <br />added to the base rate if work is performed inside the <br />boundary of a Federally Designated Hazardous Waste Site. <br />A Group 1 base rate is used for General Laborer on such a <br />site. For further information on this, call the Prevailing <br />Wage Rate Coordinator at (971) 673-0839. <br />Zone Differential for Laborers <br />(Add to Zone 1 Rate) <br />Zone 2 .65 <br />Zone 3 1.15 <br />Zone 4 1.70 <br />Zone 5 .2.75 <br />Zone l: Projects within 30 miles of city hall in the <br />- cities listed below. <br />Zone 2: More than 30 miles but less than 40 miles. <br />Zone 3: More than 40 miles but less than 50 miles. <br />Zone 4: More than 50 miles but less than 80 miles. <br />Zone 5: More than 80 miles. <br />Reference Cities <br />Albany Burns Hermiston Portland <br />Astoria Coos Bay Klamath Falls Roseburg <br />Baker City Eugene Medford Salem <br />Bend Grants Pass Newport The Dalles <br />II' '• ~1 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.