New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4581 4610 Knife River Contract 2010-00001
COE
>
PW
>
Admin
>
Finance
>
Capital
>
09 Street Bond Audit
>
GJN4581 4610
>
GJN4581 4610 Knife River Contract 2010-00001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:31:31 AM
Creation date
7/27/2009 12:08:00 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004581
GL_Project_Number
995334
Identification_Number
2010050055
COE_Contract_Number
2010-00001
Retention_Destruction_Date
11/29/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.PUBLIC WORKS BONDS <br />EVERY CONTRACTOR AND SUBCONTRACTOR who works on public works projects subject to the prevailing <br />wage rate (PWR) law is required to file a $30,000 "PUBLIC WORKS BOND"with the Construction Contractor's <br />Board (CCB). (ORS 279C.836) This includes flagging and landscaping companies, temporary employment <br />.agencies, and sometimes sole proprietors. <br />^ This bond is to be USED EXCLUSIVELY FOR UNPAID WAGES determined to be due by the Bureau of <br />Labor and Industries (BOLT). <br />^ The bond MUST be filed BEFORE .STARTING WORK on a prevailing wage rate project. <br />^ The bond is in effect CONTINUOUSLY (do not have to have one per project). <br />^ BEFORE PERMITTING A SUBCONTRACTOR TO START WORK on a public works project, <br />CONTRACTORS MUST VERIFY their subcontractors have either filed the bond, or have elected not to <br />file a public works bond due to a bona fide exemption. <br />^ A public works bond is in addition to any other required bond the contractor or subcontractor is required to <br />obtain. <br />Exemptions: <br />Allowed for contractors that are certified disadvantaged, minority, women or emerging small business <br />enterprises, for the first FOUR years of certification; <br />• Exempt contractor mint still file written verification of certification with the CCB, and give the CCB <br />written notice that they elect not to file a bond. <br />^ For projects with a total project cost of $100,000 or less, a public works bond is not required; (Note this is <br />the total project cost, not an individual contract amount.) <br />^ Emergency projects, as defined in ORS 279A.010(f). <br />ORS 279C.830(3) and (4) require: <br />That the specifications for every contract for public works shall contain a provision stating that the contractor and <br />every subcontractor must have a public works bond filed with the CCB before starting work on the project, unless <br />otherwise exempt. <br />Every contract awarded by a contracting agency shall contain a provision requiring the contractor: <br />^ To have a public works bond filed with the CCB before starting work on theproject, unless otherwise <br />exempt; <br />^ To include in every subcontract a provision requiring the subcontractor to have a public works bond filed <br />with the CCB before starting work on the project unless otherwise exempt. <br />JANUARY 1, 2009 PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.