~ ~ <br /> ~ ~ ' <br /> CARPENTER (Continued) CEMENT MASON (Continued) <br /> Note: All job or project locations shall be computed Zone 1: Projects within 30 miles of city hall in the <br /> (determined) on the basis of road miles and in the cities listed below. <br /> following manner. A mileage measurement will start at Zone 2: More than 30 miles, but less than 40 miles. <br /> the entrance to the respective city hall, facing the project Zone 3: More than 40 miles, but less than 50 miles. <br /> {if possible), and shall proceed by the normal route Zone 4: More than 50 miles, but less than 80 miles. <br /> (shortest time-best road) to the geographical center on <br /> the highway, railroad, and street construction projects Zone 5: More than SO miles. <br /> .(end of measurement). On all project contracts, the <br /> geographical center where the major portion of the Reference Cities <br /> construction is located, shall be considered the center of <br /> the project (end measurement). Bend Eugene Portland The Dalles <br /> Corvallis Medford Salem Vancouver <br /> I GrouU 1 Group 2 <br /> (Carpenter Group-I) (Carpenter Group-II) Note: All job or project locations shall be computed <br /> (determined) on the basis of road miles and in the following <br /> Group 3 Group 4 mariner. A mileage measurement will start at the entrance to <br /> j (Millwright Group-I) (Millwright Group-II) the respective city hall, facing the project (if possible), and <br /> shall proceed by the normal route (shortest time-best road) to <br /> the geographical center on the highway, railroad, and street <br /> I Groin 5 Grou~6 ,construction projects (end of measurement). On all other <br /> <br /> . (Bridge & Highway (Piledriver) project contracts, the geographical center where the major <br /> Carpenter) portion of the construction is located, shall be considered the <br /> center of the project (end measurement). <br /> Welders receive $.75/hour above their group's rate. <br /> DIVER & DIVERS' TENDER <br /> When working with creosote and other toxic, <br /> treated wood and steel material, workers shall Diver 77.94 12.22 <br /> receive $.25/hour premium pay for minimum of Divers' Tender 36.74 12.22 <br /> eight (8) hours. <br /> 1) For those workers who reside within a reference <br /> When working in sheet pile coffer dams or cells up city below, their zone pay shall be computed from <br /> to the external water level, Group 6 workers shall the city hall of the city wherein they reside. <br /> receive $.15/hour premium pay for minimum of <br /> eight (8) hours. 2) For those workers who reside nearer to a project <br /> than is the city hall.of any reference city below, the <br /> CEMENT MASON mileage from their residence may be used in <br /> computing their zone pay differential. <br /> (This trade is tended by "Concrete Laborer") <br /> 3) The zone pay for all other projects shall be <br /> Zone 1 (Base Rate) computed from the city hall of Portland. <br /> Group 1 26.80 14.83 Zone Differential for Diver/Divers' Tender <br /> Group 2 27.34 14.83 (Add to Zone 1 Rate) <br /> Group 3 27.34 14.83 <br /> Group 4 27.87 14.83 Zone 2 .85 <br /> Zone 3 1.25 <br /> Zone Differential for Cement Mason Zone 4 1.70 <br /> (Add to Zone 1 Rate) Zone 5 2.00 <br /> Zone 6 3.00 <br /> Zone 2 .65 Zone 7 5.00 <br /> Zone 3 1.15 <br /> Zone 4 1.70 <br /> Zone 5 3.00 <br /> 11~ 1 <br /> _ <br /> <br />