New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4524 Babb Const Contract 2010-00002
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4524 Babb Const Contract 2010-00002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 2:25:21 PM
Creation date
7/27/2009 12:07:52 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004524
GL_Project_Number
985216
Identification_Number
2010050056
COE_Contract_Number
2010-00002
Retention_Destruction_Date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PWR REQUIRED POSTINGS <br /> ALL CONTRACTORS AND SUBCONTRACTORS <br /> PREVAILING WAGE RATES <br /> Each and every contractor and subcontractor engaged in work on a public works must post the <br /> applicable prevailing wage rates for that project in a conspicuous place at the work site so <br /> l workers have ready access to the information. ORS 279C.840(4); OAR 839-025-0033(1). <br /> DETAILS OF FRINGE BENEFIT PROGRAMS <br /> When a contractor or subcontractor provides for or contributes to a health and welfare plan or <br /> a pension plan, or both, for the contractor or subcontractor's employees who are working on a <br /> public works project, the details of all fringe benefit plans or programs must be posted on the <br /> work site. The posting must include a description of the plan or plans, information about how <br /> and where claims can be made and where to obtain more information. The notice must be <br /> posted in a conspicuous place at the work site in the same location as the prevailing wage <br /> rates (see above). ORS 279C.840(5); OAR 839-025-0033(2) <br /> i <br /> WORK SCHEDULE <br /> Contractors and subcontractors must give workers the regular work schedule (days of the <br /> <br /> _ week and number of hours per day). in writing, before beginning work on the project. <br /> Contractors and subcontractors may provide the schedule at the time of hire, prior to starting <br /> work on the contract, or by posting the schedule in a location frequented by employees, along <br /> with the prevailing wage rate information and any fringe benefit information. If an employer <br /> fails to give written notice of the worker's schedule, the work schedule will be presumed to be a <br /> five-day schedule. The schedule may only be changed if the change is intended to be <br /> permanent and is not designed to evade the PWR overtime requirements. ORS 279C.540(2); _ <br /> -OAR 839-025-0034. <br /> JANUARY 1, 2009 PAGE 4 <br /> _ _ _ _ _ _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.