New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4585 CPM 2009-00020
COE
>
PW
>
Admin
>
Finance
>
Capital
>
09 Street Bond Audit
>
GJN4585
>
GJN4585 CPM 2009-00020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2011 9:44:53 AM
Creation date
7/10/2009 2:58:25 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004585
GL_Project_Number
995374
COE_Contract_Number
2009-00020
Retention_Destruction_Date
2/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF EUGENE <br /> ' PROPOSAL <br /> <br /> ' APRIL 7, 2009, 2:00 P.M. JOB #4585 BID .NUMBER 9 . <br /> TO THE .CITY MANAGER BIDDER: l~+~V"~I.aPf~1~j~'J Cam? <br /> EUGENE, OREGON <br /> ~ 1~'1~~'~.-- <br /> The undersigned Bidder declares: <br /> .That Bidder has carefully examined and incorporates in this Proposal, by this reference all documents included . . <br /> in the Book of Contract Documents and Specifications for this job which includes but is riot limited to the Plans, City <br /> Standard Specifications and Standard Drawings, Supplemental Specifications and Special Provisions, and City of Eugene <br /> Amendment #1, Addenda, Bid. Schedule, Prevailing Wage Rates, Contract Form, and Bond Form for <br /> PAVING. BOND MEASURE <br /> BAILEY HILL ROAD FROM W.1$~ AVENUE TO BERTELSEN ROAD <br /> CAPITAL IMPROVEMENT PROJECT <br /> That Bidder has made an examination of the site of the proposed work and has made such.investigations asare <br /> necessary to determine the character of the material and the conditions to be encountered, independently of the indication <br /> on the plans; and that if the Proposal is. accepted, Bidder will contract with the City of Eugene as provided in the Contract <br /> Form, will to the extent of this bid, provide the necessary machinery,. tools, apparatus, and other means of construction; <br /> and will furnish all material and labor as specified; or called for by the Plans or necessary to complete the work in the <br /> manner specified and in accordance with the requirements,oftpe Engineer. <br /> The undersigned also agrees that Bidder will-order all material and equipment included under this contract and <br /> will commence work within five (5) days after receipt of Notice to Proceed and that Bidder will complete the work in all <br /> respects after commencement and.will have:the project completed BYAiJGUST 28.2009 and that Bidder will pay as <br /> liquidated damages to the. City for any delay, the sum of ONE THOUSAND DOLLARS ($1,000.00) per day for each <br /> day required beyond that period. <br /> PROPOSAL -JOB #4585 ~ ~ PAGE i of 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.