PAYMEM#8 CORD BREAKOUT.xIs <br /> A B C D E F H 1 L M <br /> 1 AS 81D CORP PAYMEM BREAKOUT 11.8.02 <br /> 2 TOTAL PROJECT AS-BID COE•RECIPATH ELIGIBLE WORK COMPLETE <br /> PAID ON NOV PAY <br /> i, ITEM UNIT QUAMITV UNIT PRICE AMOUNT QUAMITY AMOUM ' <br /> e MOBILIZATION AND TRAFFIC CONTROL <br /> 7 <br /> 8 10 ON-THEJOB TRAINING HOUR 600.00 1.00 500.00 <br /> 8 20 MOBILIZATION lS 1.00 85,822.00 85,822.00 0.234363 20,113.48 0.234383 20,113.46 <br /> 70 30 TEMPORARY PROTECTION & DIRECTION OF TRAFFIC LS 1.00 4,390.00 4,390.00 0.230980 1,013.81 0.230980 1,013.91 <br /> 71 40 FLAGGERS HOUR 200.00 34.00 8,800.00 78.00 644.00 <br /> 72 50 EROSION CONTROL LS 1.00 2,090.00 ~ 2,090.00 0.230980 482.71 0.230980 ~ 48271 ~ ' <br /> 13 60 AGGREGATE CONSTRUCTION ENTRANCES EACH 7.00 940.00 8,580.00 2.00 1,880.00 2.00 7,880.00 <br /> 14 70 SILT FENCE, SUPPORTED M 1,273.50 16.00 20,378.00 180.00 2.860.00 180.00 2,880.00 <br /> 15 80 CONSTRUCTIOWSILT FENCE, SUPPORED M 445.00 12.00 6,340.00 <br /> 18 90 PERMANEM SEEDING AND MULCHING lS 1.00 14,000.00 14,000.00 0.230960 3,233.44 <br /> 17 <br /> 1B ROADWORK <br /> 19 <br /> 20 100 REMOVAL OF STRUCTURES AND OBSTRUCTIONS LS 1.00 3,410.00 3,410.00 0.230980 767.51 0.230880 787.67 <br /> 21 110 CLEARING AND GRUBBING LS 1.00 2,840.00 2,840.00 0.230860 809.73 0.230980 809.73 <br /> 22 120 EMBANKMENT IN PLACE M3 8,798.00 20.00 135,860.00 800.00 16,000.00 800.00 18,000.00 <br /> 23 130 FINISHING ROADBED AND SLOPES M2 21,970.00 0.83 18,235.10 8,505.00 7,059.15 8,505.00 7,059.15 <br /> 24 140 SUBGRADE GEOTEMILE M2 3,710.00 2.20 8,182.00 3,000.00 8,800.00 3,000.00 8,800.00 <br /> 25 <br /> 28 ORAINAGEAND SEWERS <br /> 27 <br /> 26 160 200 mm STORM SEWER PIPE M 174.00 67.00 11,856.00 <br /> 29 180 250 mm STORM SEWER PIPE M 2.30 139.00 319.70 <br /> 30 170 300 mm STORM SEWER PIPE M 51.40 88.00 3,768.40 4200 2,772.00 42.00 2.77200 <br /> 31 180 450 mm STORM SEWER PIPE M 38.00 74.00 2,688.00 <br /> 32 180 800 mm STORM SEWER PIPE M 8.00 721.00 968.00 <br /> 33 200 900 mm STORM SEWER PIPE M 40.00 127.00 6,080.00 <br /> 34 210 250/900 TEE EACH 1.00 530.00 530.00 <br /> 35 220 CONCRETE INLET, TYPED EACH 1.00 1,250.00 1,250.00 - <br /> 38 230 INSTALL HEAD GATE. COMPLETE EACH 4.00 213.00 85200 <br /> <br /> i 37 240 MANHOLE CUTIN, COMPLETE EACH 1.00 24200 24200 <br /> 36 <br /> 39 BRIDGES <br /> 40 BRIDGE#1 18993 <br /> 41 <br /> 42 250 STRUCTURE EXCAVATION LS 1.00 733.00 733.00 <br /> 43 280 GRANDULAR STRUCTURE BACKFILL LS 1.00 1,180.00 1.180.00 <br /> 44 270 FURNISH PILE DRIVING EOUIPMEM LS 1.00 2,120.00 2,120.00 <br /> 45 280 FURNISH PP324 X 9.53 STEEL PIPE PILES M 88.00 52.00 3,432.00 <br /> 46 290 DRNE PP324 X 9.5 STEEL PIPE PILES EACH 8.00 530.00 3,180.00 <br /> 47 300 REINFORCED PILE TIPS EACH 8.00 113.00 878.00 <br /> 48 310 PP324 X 9.5 STEEL PILE SPLICES EACH 1.00 189.00 189.00 <br /> 49 320 REINFORCEMENT LS 1.00 4,620.00 4,520.00 <br /> 50 330 COATED REINFORCEMENT LS 1.00 2,880.00 2,980.00 <br /> 61 340 STRUCTURAL CONCRETE. CLASS 25 LS 1.00 15,100.00 15,700.00 <br /> 52 350 STRUCTURAL CONCRETE, CLASS 30 LS 1.00 10,500.00 10,500.00 <br /> 53 360 DBT 7375 PRECAST PRESTRESSED BEAMS M 77.00 680.00 48,280.00 <br /> 5' '+70 50 mm ELECTRICAL CONDUIT M 85.00 35.00 2,275.00 <br /> 10 PEDESTRIAN BRIDGE RAIL LS 1.00 15,100.00 15,100.00 <br /> E <br /> 57 BRIDGE#2 18994 <br /> 68 <br /> ' 69 390 STRUCTURE EXCAVATION LS 1.00 733.00 733.00 <br /> 80 400 GRANULAR STRUCTURE BACKFILL LS 1.00 945.00 945.00 <br /> 61 410 FURNISH PILE DRIVING EOUIPMEM LS 1.00 2,120.00 2,120.00 <br /> 82 420 FURNISH PP324 X 9.5 STEEL PIPE PILES M 76.00 54.00 4,212.00 <br /> 63 430 DRNE PP324 X 9.5 STEEL PIPE PILES EACH 6.00 630.00 3,180.00 <br /> 84 440 REINFORCED PILE TIPS EACH 8.00 713.00 878.00 <br /> 85 450 PP324 X 9,5 STEEL PILE SPLICES EACH 8.00 189.00 1,134.00 <br /> 88 460 REINFORCEMEM LS 1.00 4,290.00 4,290.00 <br /> 67 470 COATED REINFORCEMENT LS 1.00 2,880.00 2,680.00 <br /> 88 480 STRUCTURAL CONCRETE, CLASS 25 lS 1.00 14,500.00 14,500.00 <br /> 89 480 STRUCTURAL CONCRETE. CLASS 30 LS 1.00 10,200.00 10,200.00 <br /> 70 500 DBT 1375 PRECAST PRESTRESSED BEAMS M 69.00 713.00 42,067.00 <br /> 71 610 60mm ELECTRICAL CONDUIT M 65.00 39.00 2,145.00 <br /> 72 520 PEDESTRIAN BRIDGE RAIL LS 1.00 13,200.00 13,200.00 <br /> 73 <br /> 74 BRIDGE tp 16995 <br /> 75 <br /> 78 630 STRUCTURE EXCAVATION LS 1.00 733.00 733.00 <br /> 77 640 GRANULAR STRUCTURE BACKFILL ~ LS 1.00 845.00 945.00 <br /> 78 650 FURNISH PILE DRIVING EQUIPMENT LS 1.00 2,120.00 2,120.00 <br /> 79 660 FURNISH PP324 X 9.5 STEEL PIPE PILES M 65.00 48.00 2,840.00 <br /> 80 670 DRIVE PP324 X 9.5 STEEL PIPE PILES EACH 8.00 530.00 3,160.00 <br /> 81 560 REINFORCED PILE TIPS EACH 8.00 113.00 678.00 <br /> 82 690 PP324 X 9.5 STEEL PILE SPLICES EACH 189.00 <br /> 83 800 REINFORCEMENT LS 1.00 4,290.00 4,290.00 <br /> 84 870 COATED REIFORCEMENT LS 1.00 2,880.00 2,680.00 <br /> 85 820 STRUCTURAL CONCRETE, CLA55 25 lS 1.00 14,500.00 74,500.00 <br /> 66 830 STRUCTURAL CONCRETE. CLASS 30 LS 1.00 70,200.00 10,200.00 ' <br /> 67 840 DBT 1375 PRECAST PRESTRESSED BEAMS M 69.00 713.00 42,067.00 <br /> 88 850 60 mm ELECTRCAL CONDUIT M 65.00 39.00 2,145.00 <br /> 69 880 PEDESTRIAN BRIDGE RAIL LS 7.00 13,200.00 13,200.00 <br /> 90 <br /> 91 BRIDGE JI4 18996 <br /> 92 <br /> 93 870 STRUCTURE EXCAVATION LS 1.00 733.00 733.00 <br /> 94 BBO GRANDULAR STRUCTURE BACI(FILL LS 1.00 945,00 845.00 <br /> 95 890 FURNISH PILE DRMNG EOUIPMENT LS 1.00 2,120.00 2,120.00 <br /> 96 700 FURNISH PP324 X 9.5 STEEL PIPE PILES M 73.00 46.00 3,358.00 <br /> 97 710 DRIVE PP324 X 9.5 STEEL PIPE PILES EACH 8.00 530.00 3,180.00 <br /> 98 720 REINFORCED PILE TIPS EACH 6.00 113.00 678.00 <br /> 99 730 PP325 X 9.5 STEEL PILE SPLICES EACH 169.00 <br /> 1 740 REINFORCEMENT LS 1.00 4,400.00 4,400.00 <br /> 101 750 COATED REINFORCEMEM LS 1.00 2,890.00 2,890.00 <br /> 102 760 STRUCTURAL CONCRETE. CLASS 25 l5 1.00 74,800.00 14,600.00 <br /> 103 770 STRUCTURAL CONCRETE, CLASS 30 lS 1.00 10,800.00 10,600.00 , <br /> 1 780 DBT 1376 PRECAST PRESTRESSED BEAMS M 71.00 880.00 48,280.00 <br /> 10" "10 SO mm ELECTRICAL CONDUR M 80.00 37.00 2,220.00 <br /> 7C ~ J PEDESTRIAN BRIDGE RAIL LS 1.00 15,100.00 75,100.00 <br /> 1G: - <br /> 108 Ht"TAINING WALL <br /> 1 <br /> 11 810 BLOCK RETAINING WALL EACH 875.00 9.30 8,277.60 <br /> 711 - <br /> 112 BASES <br /> PAYMENT #8 CORP BREAKOUT.xJs <br /> <br />