New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Invoice PWA-000165 BLM
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
Invoice PWA-000165 BLM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2009 5:06:33 AM
Creation date
7/10/2009 8:09:49 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
Yes
External_View
No
COE_Contract_Number
2004-05411
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/25/03 THLT 12:17 FA% 1 541 683 B767 ELTG BLM PROCIIREMEN'1'-11tH fir. uu4 <br /> <br /> i <br /> STATEMENT OF WORK <br /> Hazardous Fuels Reduction <br /> 1.0 DESCRIP'TION' OT WORC~ <br /> 'T'he City of Eugene will. supervise 1orthwest Youth Corps anal Lade :Metro <br /> Looking Glass youth crews to complete the following projects for the BLM, <br /> Eugene District Office, ~V'est Eugene Wetlands Project: Weed removal, seed <br /> collection, ladder fuels removal, identifying anal mapping potential hazardous <br /> fuels/weeds, pzotecti.on. fencing, coozdi.n..ate with BLM fire stafiF and assist with <br /> prescribing biurn and habitat iyrAprovex.?:le~at projects at scver~,1 West Eugene <br /> Wetla»d sites ti~.at occur an BLI.V.[ l.and_ The City will also oversee and coordinate <br /> all snowing activities fio reduce hazardous Fuels on wetland and upland sites within <br /> the WEW. <br /> 1.1 ~CCE55/LOCATION <br /> Access to sites is via all-weather roads. ThE sites, YYansen and Chermec:ky, are <br /> located in the West Eugene 17?etlands of the Eugene BLM District at the <br /> Oakwood T,and Site. Other sites will be idexati.~Cied at a later date. They arc <br /> located on varied terrain from steep to gentle slopes with various distances, so that <br /> the tools will need to be packed i.n. £rom 11ie roads. Work areas will be at <br /> C~overlunent-approved sites. <br /> 1.2 WORN IIO>tTRS <br /> ~7Vorlc 110CLr5, start stop times For noise-making activities (power equipment may <br /> be operated) will be between two (2) li,aurs afl:er sunrise until (1) hour before <br /> sunset. <br /> 1.3 SITE SECURITY <br /> City personnel fulfilling t11e requirements of this order will be based out the BLM <br /> facility at 751 South Danebo and. using I3LM equipment. City personnel will be <br /> responsible for seeuriz~.g all tools on site in storage space provided. Sta£f. will also <br /> be responsible For locking buildings if they are the Last person leaving the office at <br /> the end of the work day.. <br /> . Northwest Youth Corps will be supplying their own equipment, azld may leave <br /> their equipzrl.ent at the work site. However, the C~overnnie~it will not be <br /> resporlsibl.e for their equipment if it should become lost, stolen, or damaged. <br /> BLM operator r~vill be responsible for securing BLM inowulg ecluipinent. <br /> r_ <br /> _ _ _ _ _ _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.