New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3923 Babb Pmt #1
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN3923 Babb Pmt #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 10:51:51 AM
Creation date
7/9/2009 9:58:37 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
003923
GL_Project_Number
935034
Identification_Number
2009100421
COE_Contract_Number
2009-00027
Retention_Destruction_Date
6/2/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Run Date: 07/08/2009 10:07:Oo <br /> Page 2 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 001 <br /> Contractor: BABB CONSTRUCTION Original Contract: $916,940.18 <br /> Job 93-003923 Current Amount: $916,940.18 <br /> Contract No: 2009-00027 Contract Award Date: 06/15/2009 <br /> PO 2009100421 Completion Date: 10/30/2009 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals ~ Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> OLD COHURG RD TO CHAD DRIVE EXTENSION <br /> General <br /> 0000 Liquidated Damages ($700.00) DAY 0.000 <br /> $o.oo o.ooo $o.oo o.ooo $o.oo o.oo <br /> 0010 MOBILIZATION $13,182.00 LUMPSUM 1.000 $13,182.00. 0.000 $0.00 0.000 $0.00 0.00 <br /> 0020 TEMP. PROTECTION AND DIRECTION $1,000.00 LUMPSUM 1.000 $1,000.00 0.250 $250.00 0.250 $250.00 25.00 <br /> 0030 TEMPORARY SIGNS $10.00 SQFT 250.000 $2,500.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0040 PROJECT INFORMATION SZGNS $500.00 EACH 2.000 $1,000.00 2.000 $1,000.00 2.000 $1,000.00 100.00 <br /> 0050 FLAGGERS $41.70 HOUR 150.000 $6,255.00 0.000 <br /> $0.00 O.OOD $0.00 0.00 <br /> -0060 TEMPORARY BARRICADES, TYPE III $40.00 EACH 10.000 $400.00 O.ODO $0.00 0.000 $0.00 0.00 <br /> 0070 EROSION CONTROL $500.00 LUMPSUM 1.000 $500.00 0.250 $125.00 0.250 $125.00 25.00 <br /> 0080 CONSTRUCTION ENTRANCES $300.00 EACH 2.000 $600.00 1.000 $300.00 1.000 $300.00 50.00 <br /> 0090 INLET PROTECTION $40.00 EACH 4.000 <br /> $16a.oo o.ooo $o.oo o.ooo $o.oo o.oo <br /> 0100, BIO-FILTER BAG CHECK DAM $50.00 EACH 6.000 $300.00 0.000 $0.00 0.000 $0.00 0,00 <br /> 0110 COMPOST FILTER BERM $1.50 FOOT 750.000 $1,125.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0120 TEMPORARY TYPE ORANGE PLASTIC $1.80 FOOT 1,000.000 $1,800.00 207,000 $372.60 207.000 $372.60 21.00 <br /> 0130 CLEARING AND GRUBBING $25,500.00 LUMPSUM 1.000 $25,500.00 0.900 $22,950.00 0.900 $22,950.00 90.00 <br /> 0140 TREE PROTECTION $672.00 LUMPSUM 1.000 $672.00 1.000 $672.00 1.000 $672.00 100.00 <br /> 0150 REMOVAL OF PIPES $10.00 FOOT 258.000 <br /> $z,seo.oo 0.000 $o.oo o.ooo $o.oo o.oo <br /> 0160 TREE REMOVAL, 5" -24" DIA. $300.00 EACH 16.000 $4,800.00 66.000 $19,800.00 66.000 $19,800.00 413.00 <br /> 0170 REMOVAL OF SURFACINGS $3.00 SQYD 764.000 $2,292.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0180 ASPHALT PAVEMENT CUTTING $2.00 FOOT 438.000 $876.00 79.000 $158.00 79.000 $158.00 18.00 <br /> 0190 GENERAL EXCAVATION $5.44 CUYD 5,509.000 $29,968.96 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0200 6" SUBGRADE STABILIZATION $12,00 SQYD 200.000 $2,400.00 0.000 $0.00 0.000 $0.00 0.00 <br /> <br /> -0210 SUBGRADE GEOTEXTILE $0.60 SQYD 8,932.000 <br /> $5,359.20 0.000 $0.00 0.000 $0.00 0..00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.