<br /> City of Eugene
<br /> Contract Preliminary Progress Payment
<br /> Payment No 004 Final Pay
<br /> Contractor: CAMROCK EXCAVATION Original Contract: $249,360.00
<br /> Job 93-004540 Current Amount: $250,450.12
<br /> Contract No: 2009-00013 Contract Award Date: 03/17/2009
<br /> PO 2009100315 Completion Date: 07/15/2009
<br /> Assessable: No
<br /> Current Contract Estimated Payment Cumulative Totals ~ Complete
<br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount
<br /> SORREL WAY STORM - WALNUT LN TO ROAN DRIVE
<br /> General
<br /> 0000 Liquidated Damages ($400.00) DAY 0.000
<br /> $o.oo o.oao $o.oo o.ooo $o.oo o.oo
<br /> 0010 MOBILIZATION $12,058.00 LUMPSUM 1.000
<br /> $lz,ose.ao a.ooo $o.oo l.ooo $12,os8.oo loo.oo
<br /> 0020 TEMP. PROTECTION AND DIRECTION $2,500..00 LUMPSUM 1.000
<br /> $z,soo.DO o.loo $zso.oo l.ooo $z,soo.oo loo.oo
<br /> 0030 EROSION CONTgOL $1,500.00 LUMPSUM 1.000 $1;500.00 0.250 $375.00 1.000 $1,500.00 100.00
<br /> 0040 6" Trench Resurfacing $27.00 SQYD 2,225.000
<br /> $60,075.00 1,966.700 $53,100.90 1,966.700 $53,100.90 M 88.00
<br /> 0050 ROLLED CURB AND GUTTER $20.00 FOOT 200.000 $4,000.00 38.500 $770.00 69.000 $1,380.00 35.00
<br /> 0060 TREE PROTECTION FENCING $1.50 FOOT 600.000
<br /> $900.00 0.000 $o.oo a,ooo $o.oo o.oo
<br /> 0070 ROOT ZONE EXCAVATION $8.00 FOOT 100.000
<br /> $soo.oo o.DOO $o.oo D.ooo $o.oo o.oo
<br /> 0080 24 INCH STORM PIPE $58.00 FOOT 573.000 $33,234.00 0.000 $0.00 573.000 $33,234.00 M 100.00
<br /> 0090 18 INCH STORM PIPE $48.00 FOOT 319.000
<br /> $15,312.00 0.000 $0.00 319.000 $15,312.00 100.00
<br /> 0100 12 INCH STORM PIPE $34.00 FOOT 694.000
<br /> $23,596,00 0.000 $0.00 722.000 $24,548,00 104.00
<br /> 0110 10 INCH STORM PIPE $19.00 FOOT 183.000 $3,477.00 49.000 $931.00 183.000 $3,477.00 100.00
<br /> 0120 12 INCH C900 PIPE $35.00 FOOT 1,040.000 $36,400.00 21.000 $735.00 1,037.000 $36,295.00 M 100.00
<br /> 0130 10 INCH C900 PIPE $24.00 FOOT 208.000 $4,992.00 113.000
<br /> $2,712.00 205.000 $4,920.00 99.00
<br /> 0140 6 INCH C900 PIPE $26.00 FOOT 115.000 $2,990.00 106.000 $2,756.00 106.000 $2,756.00 92.00
<br /> 0150 ADJUST WASTEWATER SERVICE $24.50 FOGS 100.000
<br /> $2,450.00 0.000. $0.00 113.500 $2,780.75 114.00
<br /> 0160 CATCH BASINS, WITH BIKE PROOF .$1,068,00 EACH 20.000 $21,360.00 7.000
<br /> $7,476.00 19.910 $21,263.88 100.00
<br /> 0170 CATCH BASIN TRAPS $156.00 EACH 14.000
<br /> $2,184.00 12.000 $1,872.00 12.000 $1,872.00 86.00
<br /> 0180 CONCRETE MANHOLE, STANDARD $2,258.00 EACH 1.000 $2,258.00 0.000
<br /> $o.oo l.ooo $z,zss.oo lao.oo
<br /> 0190 CONCRETE MANHOLE, FLAT TOP $1,848.00 EACH 8.000
<br /> $14,784.00 1.000 $1,848.00 8.000 $14,784.00 100.00
<br />
<br /> 0200 CONCRETE MANHOLE, SEDIMENTATIO $3,538.00 EACH 1.000 $3,538.00 0.000 $0.00 1.000 $3,538.00 100.00
<br />
<br /> 0210 CONNECTION TO EXISTING STRUCTU $400.00 EACH 2.000 $800.00 0.000 $0.00 2.000 $800.00 100.00
<br />