Run Date: 07/08/2009 12:46:02 <br /> Page 2 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 002 <br /> Contractor: KNIFE RIVER Original Contract: $2,034,034.43 <br /> Job 93-004275 Current Amount: $2,034,034.43 <br /> Contract No: 2009-00018 Contract Award Date:. 05/01/2009 <br /> PO 2009100358 Completion Date: 10/01/2009 <br /> Assessable: Yes <br /> Current Contract Estimated Payment Cumulative Totals ~ Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> ELMIRA-FIWY 99 TO HERTELSEN, PAV, C/W, ILLUM & STM <br /> General <br /> 0000 Liquidated Damages ($1,000.00) DAY 0.000 <br /> $o.oo 0.000 $o.oo 0.000 $a.oo o.oo <br /> 0010 MOBILIZATION $45,493.18 LUMPSUM 1.000 $45,493.18 0.500 <br /> $22,746.59 0.500 $22,746.59 50.00 <br /> 0020 TEMP. WORK ZONE TRAFFIC CONTRO $7,500.00 LUMPSUM 1.000 $7,500.00 0.200 $1,500.00 0.250 $1,875.00 25.00 <br /> 0030 EROSION CONTROL $3,000.00 LUMPSUM 1.000 $3,000.00 0.250 $750.00 0.250 $750.00 25.00 <br /> 0040 CLEARING AND GRUBBING $15,000.00 LUMPSUM 1.000 $15,000.00 0.500 $7,500.00 0.500 $7,500.00 50.00 <br /> 0050 TREE PROTECTION .$2,500.00 LUMPSUM 1.000 $2,500.00 0.000 $0.00 1.000 $2,500.00 100.00 <br /> 0060 FLAGGERS $46.00 HOUR 2,700.000 $124,200.00 152.500 <br /> $7,015.00 231.500 $10,649.00 9.00 <br /> 0070 TREE REMOVAL, 5" TO 24" $600.00 EACH 10.000 6,000.00 1.000 <br /> <br /> . $ $600.00 7.000 $4,200.00 70.00 <br /> 0080 TREE REMOVAL, 25" TO 36" $700.00 EACH 13.000 $9,100.00 3.000 $2,100.00 14,000 $9,800.00 108.00 <br /> 0090 TREE REMOVAL, OVER 37" $800.00 EACH 7.000 $5,600.00 1.000 $800.00 7,.000 $5,600.00 100.00 <br /> 0100 TREE REMOVAL DURING EXCAVATION $800.00 EACH' 10.000 $8,000.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0110, REMOVAL OF STRUCTURES AND OBST $27,560.00 LUMPSUM 1.000 $27,560.00 0.100 $2,756.00 0.100 $2,756.00 10.00 <br /> 0120 GENERAL EXCAVATION $9.00 CUYD 18,894.000 $170,046.00 2,835.000 $25,515.00 2,835.000 $25,515.00 15.00 <br /> 0130 ROOT ZONE EXCAVATION $40.00 FOOT 250.000 <br /> $10,000.00 a.ooo $o.oD 0.000 $o.oo o.oo <br /> 0140 6" SUBGRADE STABILIZATION EXCA $9.50 CUYD 3,304.000 $31,388.00 358.700 $3,407.65 358.700 $3,407.65 11.00 <br /> 0150 6" SUBGRADE STABILIZATION AGGR $3.00 SQYD 19,823.000 $59,469,00 498.000 $1,494.00 498.000 $1,494.00 3.00 <br /> 0160 AGGREGATE BASE, 6 IN. THICK $4.00 SQYD 19,823.000 $79,292.00 2,744.000 $10,976.00 2,744.000 $10,976.00 14.00 <br /> 0170 RE-USE EXISTING AGGREGATE BASE $1.00 CUYD 4,000.000 $4,000.00 374.400 $374.40 374.400 $374.40 9.00 <br /> 0180 SUHGRADS GEOTEXTILE $1.00 SQYD 19,823.000 $19,823.00 1,577.000 $1,577.00 1,577.000 $1,577.00 8.00 <br /> 0190 6 INCH WW PIPE, C900 $27.00 FOOT 500.000 $13,500.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0200 6 INCH WW PIPE, PVC $27.00 FOOT 500.000 $13,500.00 123.500 $3,334.50 123.500 $3,334.50 25.00 <br /> 0210 4 INCH ROOF DRAIN PIPE $25.00 FOOT 350.000 <br /> $s,7so.oo 0.000 $o.oo 0.000 $o.oo o.oo <br /> <br />