Billable Project Costs As Of 05/31 /2009 <br /> 06/09/2009.3:16:46 PM Page 7 of 125 <br /> Project Billed Acti- Total Amount Billed <br /> <br /> Billed By v~ TranDate TranId Resource Employed uantit Amount OperOvhd AdmOvhd Transaction Remark <br /> 0460 AC Mix Verification Billable Hold $794.74 $1,064.95 $1,859.69 V~~~`( <br /> 36362]3 Materials Testing 794.74 1 <br /> 0~, 64.95 1 859.69 <br /> 286C Aspkaltic concrete quality control (CE) $28.92 $38.75 $67.67 <br /> 05/08/2009 065630126 Engineering Technician 2 1 LH $28.92 $38.75 MIX DESIGN <br /> 302C Nlix design (CE) $765.82 $1,026.20 - $T,792.02 <br /> 05/05/2009 U 1356043 Engineering Technician 2 4 L-H $92.48 $123.92 AC <br /> 05/05/2009 LJ6563043 Engineering Technician 2 2 L-H $38.56 $51.67 MIX DESIGN <br /> 05/06/2009 013790164 Engineering Associate, Sr 1 L-H $31.84 $42.67 EGGE & IWIFE RIVER MIX DSIGN <br /> 05/07/2009 01374085 Engineering Associate 4- L-H $107.24 $143.70 KN[FERIVERMIXDESIGNS <br /> 05/08/2009 01374086 Engineering Associate 3 IrH $80.43 $107.78 KNIFE RIVER MIX DESIGNS <br /> 05/08/2009 L16563046 Engineering Technician 2 2 GH $38,56 $51.67 MIX DESIGN <br /> 05/15/2009 V65630106 Engineering Technician 2 1.5 L-H $43.38 $58.13 MIX DESIGN <br /> 05/15/2009 V6563096 Engineering Technician 2 2 L-H $3R.56 $51.67 MIX DESIGN <br /> 05/28/2009 X 137401,25. Engineering Associate l L-H $26.81 $35.93 WILDISH MIXES <br /> 05/29/2009 X 13560166 Engineering Technician 2 2.5 IrH $57.80 $77.45 WILD VOIDS <br /> 05/29/2009 X13740116 Engineering Associate 5 L-H $141.00 $188.94 WILDISH MIXES <br /> 05/29/2009 X76270116 EngineeringTeclniciau2 4 LH $69.16 $92.67 WILDIS$MIXDESIGN <br /> k <br /> <br />