New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4592 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4592 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:38:46 AM
Creation date
7/8/2009 8:56:22 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004592
GL_Project_Number
955444
Retention_Destruction_Date
10/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and ' <br /> Public Works <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 99 E. Broadway, #400 <br /> ' Eugene, OR 97401 <br /> (541) 682-5291 <br /> .DATE CONTRACT NO. " <br /> 07/02/2009 09-22 <br /> PROJECT NAME JOB NO. <br /> 2009 PPP Slurry Seal 4592 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Valley Slurry. Seal. <br /> INSPECTOR . PHONE NUMBER DATE OF AWARD <br /> Josh Pinkham 541 682-8473 06/17/2009 <br /> FIRST NOTIFICATION ~ <br /> .4 <br /> 06/29/2009 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. ti. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT: 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION. <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: <br /> (SEE'SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS fOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> <br /> s IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIQD. <br /> IN ACCORDANCE WITH. SECTION 00170.0E THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1; ALL WORK iS GUARANTEED BY THE <br /> CONTRACTOR FOR ONE YEAR FOLLOWING?HE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES _ <br /> REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br /> THE CONTRACTOR 1S RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT BECOME EVIDENT <br /> WITHINTHE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR WARRANTY PERIODWILLBE <br /> REQUIRED TO BE GUARANTEED fOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br /> Inspector Signature <br /> For Privately Engineered Projects Only <br /> Engineer: <br /> Address: <br /> Owner: <br /> Address: <br /> DISTRIBUTION FOR Fff2ST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager File GingerPerales,'PWM <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> POS Maintenance-Planning Sutety ' PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisorlnspector <br /> Q:\PROJECTS\PROJ-2\4592\Correspondence\Contractors\4592-20090702 First Notification.doc March Zoos <br /> r~1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.