New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4602 KSH Construction 2009-00029
COE
>
PW
>
Admin
>
Finance
>
Capital
>
09 Street Bond Audit
>
GJN4602
>
GJN4602 KSH Construction 2009-00029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:04:21 PM
Creation date
7/6/2009 12:18:00 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004602
GL_Project_Number
995814
COE_Contract_Number
2009-00029
Retention_Destruction_Date
1/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> U6:,rU?./2049 11 : ~l6 FAQ 5a 1 6d2 536b UIT~f EUIiENE Pw ENIi l~ U~J2,rGU5 <br /> . E'ublic works <br /> Engineering <br /> . City of Eugene <br /> 99 East Broadway. Suite 400 <br /> Eugene, Aragon 97401 <br /> (541) Bt32-5291 <br /> (541) 682-8410 FAX <br /> ADDENDUM NO. 1 <br /> TO THE Ct7N'x'RACT DOCUMENTS ANI1 SY'ECIFICATIONS F()R <br /> PBM AMAZON PATIO REiIIABII.I'TATION PROJECT FROM <br /> 19~ AVENUE TO 31~ ,A.VENUE <br /> Jane 1, 2009 J4)9~ 2 BID NUMBER 18 <br /> T~ ALL PLANHOLDERS: <br /> The following changes shat! amend and supplement the project bidding documents only to the extent specifically <br /> shown and noted. All other conditions shall remain the same. <br /> Bidders shall incorporate the effects of these changes in the appropriate bid items included in this addendum and the <br /> total of these bid items then add in the appropriate place on the bid form. <br /> ' CHANGES TC1 Bl~i SCHEDULE: <br /> (p£LETE) Original Bid Schedule dated 05/1 S/2009 <br /> (ADD) Revised Bid Schedule dated 06/0112009 <br /> CHANGES TO SFECIAL PRCIVY_ PONS: <br /> 00150.b0(e) Itesponaible iar Damages <br /> (DELETE) The Contractor shall be responsible for damage to the path, sidewalks, and driveways due to <br /> Contractor vehicles, equipment or any other construction related reasons. <br /> (ADD) The Contractor shall be responsible for damage to the path, sidewalks, and driveways due to <br /> Contractor vehicles, equipment or any other construction related reasons outside of the designated <br /> construction access mutes idex?tiFied on the C.S.M.P.(Tree Preservation plan sheets. Path to be <br /> removed and replaced shall be desi,~mated as construction access routes prior to replacement. <br /> OOZ20.OZ Public Safety and Mobility - <br /> (1:71:,LETE) . <br /> • Sidewalk and access ramp construction on 315` Avenue shall be phased to maintain sidewalk <br /> access along one side of 315` ,A,venue between Hilyard Street and Ferry at one times. <br /> (ADD) <br /> Sidewalk and access rump construction on 31" Avenue shall be phased to maintain sidewalk <br /> access alotag one side of 3151 Avenue between Hiiyard Street and Feny at ali times. <br /> 00330.92 Kinds of Ineidental EartLwnrk - <br /> (DELETE) Excavation and disposal for multi-use path and curtain walUgrade beam construetion. <br /> w ~J..~L-r. 17.. ~ Y..i. IF/LA~f p$Q~ 1 <br /> _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.