New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4624 CPM Dev 2009-00028
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4624 CPM Dev 2009-00028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:27:54 PM
Creation date
7/6/2009 12:17:58 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004624
GL_Project_Number
317017
COE_Contract_Number
2009-00028
Retention_Destruction_Date
12/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. Comcast Tom Henerty cell 541-228-1884 <br /> • office 541-484-3605 <br /> <br /> . ' 4. Qwest Lenny D'Ambrosia 541-484-8952 <br /> 5. Northwest Natural Dave Shore cell 541-954-1996 <br /> office 541-302-8429 <br /> 00150.55 Cooperation with Other Contractors <br /> (ADD) The City of Eugene is contracting with Lane County Public Works to provide a <br /> double emulsified chip seal wearing course on Riverview Street and Floral Hill <br /> Drive The Contractor shall coordinate Full Depth Reclamation work timing with <br /> Lane County Public Works and provide a work window for Lane County to <br /> complete chip seal operations. The chip seal is tentatively scheduled for <br /> construction between July 15 and July 17, 2009, weather permitting. <br /> 00180.40. Limitations of Operations <br /> (ADD) On Riverview Street and Floral Hill Drive, full depth reclamation shall be <br /> completed between June 22 and July 10, 2009. <br /> On Cross Street, HMAC paving shall be completed on the same day as full depth <br /> reclamation or alternatively full depth reclamation shall be done on a Friday or <br /> Saturday with HMAC paving completed the following calendar day. <br /> 00180:41 Project Work Schedules <br /> (ADD) A Type A schedule as detailed in the specifications is required on this Contract. <br /> 00180.50 Contract Time to Complete Work <br /> (h) Contract Time <br /> (ADD) Work shall be completed by July 24, 2009. <br /> `No weekend or holiday Work shall be allowed unless otherwise specified in these <br /> `Special Provisions. <br /> 00180.85 Failure to Complete on Time: Liquidated Damages <br /> (b) Liquidated Damages <br /> (ADD) Liquidated damages in the amount of $500.00 per Calendar Day will be <br /> assessed for each Calendar Day beyond.:the completion date that the work is not <br /> complete. In addition, liquidated damages in the amount of $500.00 per Calendar <br /> day will be assessed for each Calendar day beyond the timeframe limitations for <br /> construction operations as defined in subsection 001,80.40, "Limitation of <br /> Operations", of these Special Provisions. • <br /> Liquidated damages are calculated separately and are additive. <br /> Special Provisions -Job #4624 Page 2 of 15 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.