New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4624 CPM Dev 2009-00028
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4624 CPM Dev 2009-00028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:27:54 PM
Creation date
7/6/2009 12:17:58 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004624
GL_Project_Number
317017
COE_Contract_Number
2009-00028
Retention_Destruction_Date
12/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF EUGENE <br /> • PROPOSAL <br /> MAY 28, 2009, 2:00 P.M. JOB #4624 ~ SID NUMBER 17 <br /> TO THE CITY MANAGER BIDDER: C-~~'~ c~. ~ c~ <br /> EUGENE, OREGON ~ ~1~`z~~ <br /> The undersigned Bidder declares: <br /> That Bidder has carefully examined and incorporates in this Proposal, by this reference all documents included <br /> <br /> • in the Book of Contract Documents and Specifications for this job which includes but is not limited to the Plans, City <br /> Standard Specifications and Standard Drawings, Supplemental Specifications and Special Provisions, and City of Eugene <br /> Amendment #1, Addenda, Bid Schedule, Prevailing Wage Rates, Contract Form, and Bond Form for <br /> 2009 POTHOLE REPAIR PROJECT ON RIVERVIEW ST FROM E 16TH AVE TO <br /> FLORAL HILL DRIVE AND FLORAL HILL DRIVE FROM ADDRESSES 3087 - 2855 <br /> CROSS ST FROM GARFIELD ST TO CLEVELAND ST <br /> CAPITAL IMPROVEMENT PROJECT <br /> That Bidder has made an examination of the site of the proposed work and has made such investigations as are <br /> necessary to determine the character of the material and the conditions to be encountered, independently of the indication <br /> on the plans; and that if the Proposal is accepted, Bidder will contract with the City of Eugene as provided in the Contract <br /> Form, will to the extent of this bid, provide the necessary machinery, tools, apparatus; and other means of construction, <br /> and will fiunish all material and labor as specified, or called for by the Plans or necessary to complete the work in the <br /> manner specified and in accordance with the requirements of the Engineer. <br /> The undersigned also agrees that Bidder will order all material and equipment included under this contractand <br /> will commence work within five (5) days after receipt of Notice to Proceed and that Bidder will complete the work in all <br /> respects after commencement and will have the project completed as specified in the Special Provisions and that Bidder <br /> will pay as liquidated damages to the City for any delay as specified in the Special Provisions. <br /> PROPOSAL -JOB #4624 PAGE 1 of 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.