BID NO.15 <br /> f ~ ; <br /> CALL FOR BIDS . <br /> <br /> i <br /> Notice is hereby given that the City, Council of the City of Eugene, Oregon will receive sealed bids until Thursday, <br /> ;May 21, 2009, until the Bid Closing time of 2:00. p.m. at the office of the City Engineer, 99 East Broadway Suite <br /> 400; Eugene, Oregon, The Bid Opening will be at 2:OS p.m., on Thursday, May 21, 2009, at the above location, at ' <br /> which time and place those Bids will be opened and read. <br /> Job 2009 WASTEWATER POINT REPAIRS <br /> <br /> I, 4594 at various locations in the City (66' TON AC Trench Patch Various Depths; 2,057 SF 4", 5" & 7" <br /> Concrete; 496. FT 8",10",12",15",18" & 24" PVC Wastewater Pipe; 315 Ft 4"/6" Wastewater SVC <br /> Pipe; 66 EA Construct 4"/6" Wastewater SVC Connection; l2 EA Construct Deep 4"/6" Wastewater <br /> :SVC Connection; 1 LS Final TV Pipe Inspection). <br /> All work shall be compieted~by September 18, 2009. , <br /> .Plans and specifications may be reviewed and/or obtained at the office of the City Engineer, 99 East Broadway, <br /> Eugene, Oregon 97401, for anon-refundable fee of $15.00 plus $6.SO.postage. For other reviewing.locations and <br /> any questions.regarding the project please call (541) 682-5560, or use our Engineering Bid Website www.eugene_ <br /> or. og <br /> v/PW to review Plans and Specifications. <br /> Bids shall be accompanied by a certified check, cashier's check or.bidder's bond payable to the City of Eugene in an <br /> amount equal to ten percent of the amount bid. Filing of a qualification questionnaire before bidding will not be <br /> .required. Contingent or conditional bids will not be considered for acceptance. This public works improvement <br /> project is subject to payment of prevailing rate of wages, per BOLI ORS 279C.800 to 279C.870. No bid will be <br /> received or considered unless the bid contains, a statement by the .bidder that provisions of ORS 279C.800 to <br /> 279C.870 pertaining. to prevailing wage rates shall be complied with. <br /> Bidders are` required to submit aFirst-Tier Subcontractor Disclosure form, substantially as described. in ORS <br /> 279C.370, prior to the Bid Closing Date and Time. For this.project the first-tier subcontractor disclosure statement <br /> ,must be submitted regardless of the bid amount." <br /> ' No bid will be accepted by the City unless it contains a statement by the bidder as a part of the bid that the bidder in . <br /> carrying out. the contract will comply with all applicable laws. <br /> The City may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and <br /> may reject for good cause any or all bids or to waive any specification or requirement updri a finding of the Citythat it . <br /> is in the public interest to do so. <br /> Dated this 7th day of May, 2009: <br /> Daivd Stares <br /> Project Manager <br /> <br />