New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4535 Warranty begin plants only
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4535 Warranty begin plants only
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 10:44:24 AM
Creation date
6/29/2009 2:40:48 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004535
GL_Project_Number
985246
COE_Contract_Number
2009-00007
Retention_Destruction_Date
10/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br /> Public Works <br /> `Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 682560 <br /> DATE CONTRACT NO. <br /> 6/24/2009 2009-007 <br /> PROJECT NAME JOB NO. <br /> PINE CANYON STORM IMPROVEMENTS- (PLANTING ONLY) 4535 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> DELTA CONSTRUCTION <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> THOMAS FAHSBENDER 682-8848 09/09/08 <br /> FIRST NOTIFICATION <br /> 09/15/08 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DA'Z'E (S) (FROMSECT.-00180.50) DAYS CHARGED DATE (S) THE WORK WAS' SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> - COMPLETION. <br /> 12/31/2008 0 12/12/2008 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: <br /> (SEE SUBSECTION 00199.30 OFTHE -CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION - <br /> Notice of Completion. Begin Warranty Period. <br /> 12/12/08 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS. <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3 and #4, ALL WORK IS GUARANTEED <br /> FAY THE CONTRACTOR FOR ONE YEAR-FOLLOWING THE DATE OF THE CITY'S'NOTICE OF WORK COMPLETION. MANUFACTURE <br /> ..WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THBEXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br /> . ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY.BY DEFECTS IN WORK THAT <br /> BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MApE WITHIN THE ONE- WARRANTY <br /> PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE 'PAIR: <br /> ' Inspector Signature <br /> For Privately Engineered Projects Only <br /> .Engineer: <br /> Address: <br /> Owner: <br /> Address: <br /> DISTRIBUTION FOR FIRST, SECOND; AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner ConsGvctioq Manager File Ginger Perales, PWM <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration. PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> <br /> Q:\PROJECTS\PROJ-5\4535\Correspondence\Contractors\4535-Third Notification PLANTING.doc APR?~ 2ooa <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.