New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4501 4528 4561 Wildish Contract 2009-00026
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4501 4528 4561 Wildish Contract 2009-00026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 10:31:38 AM
Creation date
6/24/2009 11:11:55 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004501
GL_Project_Number
985034
COE_Contract_Number
2009-00026
Retention_Destruction_Date
8/31/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.7.2.5. If upon an investigation conducted pursuant to rules adopted by the city manager <br /> in accordance with section 2.019 of the Eugene Code, 1971 there is reasonable <br /> cause to believe that Contractor or any subcontractors of Contractor have failed to <br /> comply with any of the terms of paragraphs 7.2.1 or 7.2.2, a determination thereof <br /> shall be made in accordance with the adopted rules. Such determination may <br /> result in the suspension, cancellation or termination of the Contract in whole or in <br /> part and/or the withholding of any funds due or to become due to Contractor, <br /> pending compliance by Contractor and/or its subcontractors, with the terms of <br /> .paragraphs 7.2.1 and 7.2.2. <br /> 8. Indemnification. To the fullest extent permitted by law, Contractor shall indemnify, defend <br /> (with counsel approved by City) and hold fiarmless City, its officers, agents and employees, <br /> the Architect/Engineer, Architect/Engineer's consultants, and their respective officers, <br /> directors, agents, employees, partners, members,.stockholders and affiliated companies from <br /> and against all liabilities, damages, losses, claims, expenses (including reasonable attorney <br /> fees), demands and actions of any nature whatsoever, arising out of or resulting from <br /> Contractor's performance or failure to perform under the Contract, as further specified in the <br /> General Conditions. <br /> 9. Insurance. Contractor shall maintain in force for the duration of the Contract the insurance <br /> coverages specified within the General Conditions. Each policy required by these provisions <br /> shall be written as a primary policy, not contributing with or in excess of any coverage which <br /> City may carry. A copy of each policy or a certificate satisfactory to City shall be delivered to <br /> City prior to commencement of the Work. Unless otherwise specified, each policy shall be <br /> written on an "occurrence" form with an admitted insurance carrier licensed to do business in <br /> the state of Oregon and shall contain an endorsement entitling City to not less than 30 days <br /> prior written notice of any material change, nonrenewal or cancellation. In the event the <br /> statutory limit of liability of a public body for claims arising out of a single. accident or <br /> occurrence is increased above the combined single limit coverage requirements specified <br /> ...below, City shall have the right to require Contractor to increase Contractor's coverages by <br /> the amount of the statutory limit increase for such claims and to increase the aggregate <br /> coverage by an amount that is twice as large as the statutory increase. The adequacy of all <br /> insurance required under the Contract shall be subject to approval by City's Risk Manager. <br /> Failure to maintain any insurance coverage required by the Contract shall be cause for <br /> immediate termination of the Contract by City. <br /> 10. Performance and Payment Bonds. Prior to the commencement of the Work, Contractor <br /> shall provide good and sufficient performance and payment bonds~approved by City and <br /> substantially in the form of the bonds included in the Solicitation Documents. <br /> <br /> 11. Termination and Suspension. City may terminate the Contract or suspend the Work at any <br /> time as provided in the Specifications. <br /> 12. Preference for Goods and Services. <br /> .12.1. Contractor shall use recyclable products to the maximum extent economically feasible <br /> in the performance of the Work. Recycled products include all materials, -goods and <br /> supplies, not less than 50°10 of the total weight of which consists of secondary and post <br /> consumer waste with not less than 10% of its total weight consisting of post consumer <br /> waste, as well as any product that could have been disposed of as a solid waste, <br /> having completed its life cycle as a consumer item, but otherwise refurbished for reuse <br /> without substantial alteration of the product's form. <br /> Public Improvement Contract for Use with Oregon Standard Specifications -Page 3 <br /> (Revised October 2008) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.