STANDARD SPECIFICATIONS <br /> The 2008 Oregon Standard Specifications for Construction Volumes I and II (Oregon Specifications) as <br /> issued in 2008, and,the City of Eugene Standard Drawings, in effect as of January 27, 2009, both as <br /> revised by Amendment #1 have been adopted as the Standard Specifications and Standard Drawings <br /> for the City of Eugene in accordance with City Code section 7.085. Amendment #1 is hereby made a <br /> part of the Standard Specifications and Standard Drawings of the City of Eugene as fully and <br /> completely as if it was set forth therein. The Standard Specifications, Standard Drawings and all <br /> Addenda :may be examined at the Engineering :office located at 99 E. Broadway, Suite. 400, Eugene OR <br /> 97401. <br /> ' SPECIAL PROVISIONS FOR <br /> FIRE STATION 8 -PARKING LOT RESURFACING <br /> CITY.OF EUGENE JOB 4595 <br /> All. number references .in these Special Provisions shall be understood to refer to the Sections and <br /> subsections of the Standard Specifications bearing like numbers and 'to Sections and subsections <br /> contained in these Special Provisions in their entirety. <br /> • SPECIAL PROVISIONS <br /> 00120.15 Examination of Work Site and Solicitation Documents; Consideration of <br /> Conditions Encountered <br /> (Add) Inquires regarding the plans, specifications, and contract documents shall be made to: <br /> Adam Steffen - (541) 682-5040 or adam.r.steffenCc~ci.eugene.or.us <br /> 00130.50(a) Execution of Contract and Bonds (By the bidder) <br /> (Replace) 10 Calendar Days with; 5 Calendar Days. <br /> 00150.55 Cooperation with Other Contractors <br /> (Add) Significant reconstruction of adjacent Elmira and Maple Streets will occur during this <br /> project. The Contractor shall coordinate access and haul routes as necessary to ensure <br /> that conflicts with this adjacent project are minimized. <br /> 00170.03 Furnishing Right-of Way and Permits <br /> (Add) -The City of Eugene will procure and provide all building permits and permit drawings to <br /> Contractor. Contractor shall call for inspections at required times and maintain permit <br /> drawings in an accessible location at all times for permit inspections and signatures. <br /> 00180.41 Project Work Schedules <br /> (Add) A Type A schedule as detailed in the specifications is required on this Contract. <br /> (Add) Contractor shall include up to 7 consecutive calendar days cure time as necessary in <br /> their schedule to allow for concrete strength, requirements of 756.61 to be met between <br /> Phase 1 and Phase 2. , <br /> <br /> Special Provisions -Job #4595 -Fire Station 8 Parking Lot Renovation Page 1 <br /> <br />