<br /> Q5r'22l2008 12:47 FA}t a41 682 841 CITY EUGENE Pw ENG wILUISH COMSTRUC ~1002I00~~,~ <br /> Public Works <br /> engineering <br /> City of Eugene <br /> 99 East Broadway, Suite 4t1~0 <br /> ' Eugene, Oregon 97401 <br /> ADpENT?UM Nfl?.1 (541) $~2.55Bo <br /> c~41) BB2-$410 i=Ax <br /> TO TlEIE CONTRACT DOCiJMENTS AND SFECIFICATIONS FOR <br /> 2009 PAVEMENT PRESERVATION PROGRAM <br /> WEST 11"' AVENILIE 1~.tO1Vl<+GARFIELD STREET TO TYILVN STREET (,1<O$ #4340) <br /> Gam" AND 7Y" AVENTTE$ FRAM H>[GJFI STIIEJE'1' 'TO WASHIlYGTON STREET (JQB #4529) <br /> May 2Z, 2009 JOB #4340 ANID 4529 B1D NUMBER 16 <br /> TO A1t.L, FLANlHOlf,D1ER5: <br /> The following changes shall amend and supplement the project bidding documents only to the extent specifically <br /> shown and noted. All other conditions shall remain the same. <br /> Bidders shall incorporate the effects of these changes in the appropriate bid items included in this addendum az?d <br /> the total of these bid items then add in the appropriate place on tine bid fartrn. <br /> ~FIANCxES TQ BID SCHEDU~.E: <br /> (DELETE) Original Hid Schedule dated OSI11f2009 <br /> (ADD) Revised Bid Schedule dated 051z2/Z009 <br /> CHANGES TO SPECIAL FROVI$I NS: <br /> 00620.43 Maintenance '[Xnder Traffic <br /> (DELETE) The sentence beginning "For 6th and 7th avenues...". <br /> (AD~f) For Gth and 7th avenues, cold plane surfaces shall be repaved with top lift paving within four ~4) <br /> Calendar days of cold plane operations. <br /> 004~?5.90 ~ Payment <br /> (ADD) HMAG or WNIAC trench resurfacing sha11 be paid for according to, 00745.90_ <br /> 00759.90 General <br /> (A711?D) Variable height curb used for construction of sidewalk access ramps will be paid fog by the square <br /> foot as "Concrete Waltcs". <br /> REVIS1tONS 'Y'O PLAN STl<EETSt <br /> (REVISE) Plari Sheet 4529-TSOI, label the north-south street as Charneltvn label the east-wese stireet <br /> as 6'" Avenue. <br /> Addendum #1-,Jobs #4340 & 4529 t~'age 1 <br /> <br />