Final Acceptance ~ Pub,icworks <br /> Completion of Warranty Period Engineering <br /> 99 East Broadway, Ste 400 <br /> Eugene, OR 97401 <br /> (541) 682-5291 <br /> (541) 682-8410 <br /> To: H&J Construction Date: June 10, 2009 <br /> Phil Heer <br /> P.O. Box 2432 From: Chaney Perini <br /> .Eugene, OR 97402-1751 <br /> Project: 8th Ave Renovation <br /> Contract Number:. 2008-51.6 Job Number: 4525 <br /> A warranty inspection has been made on this project in accordance with. Section 00150 of the <br /> City Standard Specifications and Standard Drawings. <br /> No defects were noted and/or were corrected the project is hereby accepted by the. City for <br /> permanent maintenance. <br /> FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> Engineer. ~ Weber Elliot Engineers <br /> Address: P.O..Box 10145 <br /> Eugene, OR 97440 <br /> Owner. Metropolitan Affordable Corporation <br /> Address: 1430 Pearl Street. <br /> Eugene, OR 97401 <br /> <br /> Q:\PROJECTS\PROJ-5\4525 8th Ave\Correspondence\Contractors\4525-20090610CP-Final Acceptance.Completion of Warranty Period.doc <br /> ENG 1122 - Contractor File Engineer Owner Surety PW Admin Construction Manager Revised 4/04 <br /> Finance/Accts Receivable for assessable. projects or City Recorders Office for nonassessable projects K`~ <br /> <br />