Run Date: 06/04/2009 11:23:04 <br /> Page 2 <br /> City of Eugene <br /> Contract Preliminary prnarPCe yavmanr <br /> Payment No 001 <br /> Contractor: KNIFE RIVER Original Contract: $2,034,034.43 <br /> Job 93-004275 Current Amount: $2,034,034.43 <br /> Contract No: 2009-00018 Contract Award Date: 05/01/2009 <br /> <br /> i PO 2009100358 Completion Date: 10/01/2009 <br /> Assessable: Yes <br /> Current Contract Estimated Payment Cumulative Totals ~ Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantit Amount <br /> ~ Quantity Amount <br /> ELMIRA-HWY 99 TO BERTELSEN, PAV, C/W, ILLUN & STN <br /> General <br /> 0000 Liquidated Damages ($1,000.00) DAY 0.000 $0.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0010 MOBILIZATION $45,493.18 LUMPSUM 1.000 45 493.18 0. <br /> $ 000 0.0 <br /> 0 0.000 <br /> $ $0.00 0.00 <br /> 0020 TEMP. WORK ZONE TRAFFIC CONTRO $7,500.00 LUMPSUM 1.000 $7,500.00 0.050 $375.00 0.050 $375.00 5.00 <br /> 0030 EROSION CONTROL $3,000.00 LUMPSUM 1.000 $3,000.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0040 CLEARING AND GRUBBING $15,000.00 LUMPSUM 1.000 $15,000.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0050 TREE PROTECTION $2,500.00 LUMPSUM 1.000 $2,500.00 1.000 $2,500.00 1.000 $2,500.00 100.00 <br /> 0060 FLAGGERS $46.00 HOUR 2,700.000 $124,200.00 79.000 $3,634.00 79.000 $3,634.00 3.00 <br /> 0070 TREE REMOVAL, 5" TO 24" $600.00 EACH 10.000 $6,000.00 6.000 $3,600.00 6.000 <br /> $3,600.00 60.00 <br /> 0080 TREE REMOVAL, 25" TO 36" $700.00 EACH 13.000 $9,100.00 11.000 $7,700.00 11.000 <br /> $7,700.00 85,00 <br /> 0090 TREE REMOVAL, OVER 37!' $800.00 EACH 7.000 $5,600.00 6.000 $4,800.00 6.000 $4,800.00 86.00 <br /> 0100 TREE REMOVAL DURING EXCAVATION $800,00 EACH 10.000 $8,000.00 0.000' $0.00 0.000 $0.00 0.00 <br /> 0110 REMOVAL OF STRUCTURES AND OBST $27,560.00 LUMPSUM 1.000 $27,560.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0120 GENERAL EXCAVATION $9.00 CUYD 18,894.000 $170,046.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0130 ROOT ZONE EXCAVATION $40.00 FOOT 250.000 $10,000.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0140 6" SUBGRADE STABILIZATION EXCA $9.50 CUYD 3,304.000 $31,388.00 0.000 $0.00 0.000 $0.00 O.DO <br /> 0150 6" SUBGRADE STABILIZATION AGGR $3.00 SQYD 19,823.000 $59,469.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0160 AGGREGATE BASE, 6 IN. THICK $4.00 SQYD 19,823.000 $79,292.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0170 RE-USE EXISTING AGGREGATE BASE $1.00 CUYD 4,000.000 $4,000.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0180 SUBGRADE GEOTEXTILE $1.00 SQYD 19,823.000 $19,823.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0190 6 INCH WW PIPE, C900 $27.00 FOOT 500.000 $13,500.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0200 6 INCH WW PIPE, PVC $27.00 FOOT 500.000 $13,500.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0210 4 INCH ROOF DRAIN PIPE $25.00 FOOT 350.000 $8,750.00 0.000 $0.00 0.000 $0.00 0.00 <br /> <br />