Run Date: 06/09/2009 12:29:10 <br /> Page 2 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 002 Final Pay <br /> Contractor: LANTZ ELECTRIC Ori final Contract: <br /> Job 93-004578 g $53,943.00 <br /> _ Current Amount: <br /> Con 54 733.25 <br /> tract N <br /> 0 2009 00014 $ . <br /> PO 2009100337 Contract Award Date: 03/23/20D9 <br /> Assessable: No Completion Date: 05/30/2009 <br /> Current Contract Estimated Payment Cumulative Totals ~ Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount <br /> Quantity Amount Quantity Amount <br /> TRAFFIC SIGNAL HUB RELOCATION <br /> General <br /> 0000 Liquidated Damages (5500.00) DAY 0.000 <br /> $o.oo o.ooo $o.oo o.ooD $o.DO o.oo <br /> 0010 MOBILIZATION $500.00 LUMPSUM 1.000 $500.00 0.000 $0.00 1.000 <br /> $500.00 100.00 <br /> 0020 CONCRETE SAWING $3.75 FOOT 120.000 $450.00 0.000 $0.00 55.000 <br /> $318.75 71.00 <br /> 0030 CONCRETE WALKS $7.25 SQFT 300.000 $2,175.00 0.000 $0.00 180.000 <br /> $1,305.00 60.00 <br /> 0040 CONCRETE SLAB, REMOVE $18.00 SQYD 34.000 $612.00 0.000 $0.00 20.000 <br /> $360.00 59.00 <br /> 0050 INTERCONNECT SYSTEM $42,760.00 LUMPSUM 1.000 $42,760.00 O.ODO $0.00 1.000 <br /> $42,760.00 M 100.00 <br /> 0060 JUNCTION HO% $300.00 EACH 1.000 $300.00 0.000 $0.00 2.000 <br /> $600.00 200.00 <br /> 0070 TEMP. WORK ZONE TRAFFIC CONTRO $800.00 LUMPSUM 1.000 $800.00 0.000 $0.00 1.000 <br /> $800.00 100.00 <br /> 0080 EROSION CONTROL $100.00 LUMPSUM 1.000 $100.00 0.000 $0.00 1.000 <br /> $100.00 100..00 <br /> 0090 TRHE PROTECTION FENCING $3.00 FOOT 50.000 $150.00 0.000 $0.00 103.000 $309.00 206.00 <br /> 0100 CONDUIT, 3" RIGID (EMT) SURFAC $10.40 FOOT 300.000 $3,120.00 0.000 $0.00 312.000 <br /> $3,244.80 104.00 <br /> 0110 CONDUIT, 3" RIGID UNDERGROUND $30.00 FOOT 60.000 $1,800.00 0.000 $0.00 53.500 $1,605.00 89.00 <br /> 0120 FRANGIBLE BASE FOUNDATION $566.00 EACH 1.000 $566.00 0.000 $0.00 1.000 <br /> $566.00 100.D0 <br /> 0130 CONDUIT, 2" RIGID UNDERGROUND $18.00 FOOT 20,000 $360.00 0.000 $0.00 19.000 <br /> $342.00 95.D0 <br /> 0140 CORE DRILL 10" WALL $150.00 EACH 1.000 $150.00 0.000 $0.00 1.000 <br /> $150.00 100.D0 <br /> 0150 CORE DRILL VAULT $100.00 EACH 1.000 $100.00 0.000 $0.00 2.000 <br /> $200.00 200.00 <br /> <br /> 0160 12 Pair Traffic Signal Interco 001 $790.25 lumpsum 1.000 $790.25 1.000 $790.25 1.000 <br /> $790.25 100.00 <br /> $54,733.25 $790.25 $53,950.80 <br /> <br />