• <br /> I <br /> • <br /> Exhibit A <br /> CITY OF EUGENE carrying out the contrect wiu comply with <br /> j TRAFFIC SIGNAL HU8 RELOCATION all aPPt~ble <br /> Bids due 2:00 pm, March 5 The ~Y may reject any bid not in corn- <br /> CALLFOR BIDS Puente w+?h all presctbgd public 6ldding <br /> Coundi <br /> ofihe ~ that the city 1 ~ reg~ <br /> tear <br /> se8~ <br /> or <br /> aM <br /> W~ o 0 <br /> ~Y ~ Erne, oregor, win ~ <br /> receive sealed bide undl Thursday, March waive any apedticstion or requirement <br /> 5, 2009, unW the Bid Cbstng tone of 2:00 upon a Ysrdtng of the City tttai it is M the <br /> p.m. at the offtce of the CNy Engineer, 99 prrbiic interest to do so. <br /> East Broadway 3ulte 400, Eugene, Or- Dated this 20th day of February, 2009, <br /> egos. The Bid Opening wUl he at 2:05 Steve Gallup <br /> p.m., on Thursday, March 5, 2008, at the PuWtshed Fab: 20, 2008. 101~41411T8-1t <br /> above location, at whict? ume and place <br /> those Bids wUl be opened and read. e ~ ~ • ~ ~ ~ ~ ~ • <br /> ~ Job 4578 TRAFFIC SIGNAL HUB RE- . <br /> . LOCATION from 858 Pear! Street to 126 <br /> East 8th Avenue. The Trafftc Signal HUB <br /> k Ore central owrtputer for the Cuy of Eu• <br /> dgene trefftc t <br /> ~~e <br /> a ~P?ol~cahle~ <br /> wiUrin a seven block area of downtown Eu- <br /> gene: See the plan set for Pleb apeaftr~. <br /> (120 FT Concrete Sawfng; 300 SF Corp <br /> crate Walks; 300 SF Concrete Slab, Re• <br /> move: 1 LS lntercorrnect System; 1 F~4 ~ <br /> Jur>cUon 80151 LS Temp. Work Xone Traf• <br /> flc Control. Complete: 1 LS Erosion Con- <br /> trol; 60 FT Tree Protection Fencing; 300 <br /> FT Conduit, 3' Rigid (EMT) Surface MounO . <br /> 600 FT Conduit. 9' Rigid Underground; t . <br /> EA Flanglble Base Foundafton; 20 FT Con- <br /> d~ft, 2' Rigid Underground; l EA Core Ddll <br /> 10' Wa9;1 FJ1 Core Drin Vault}. <br /> An work shall be completed by Apri630, <br /> 2009. <br /> 'MANDATORY PRE-BID MEETING: All <br /> bidders must attend a mandatory, pre-61d . <br /> meeting to tie held on Thursday , February <br /> 26, ?009, ai 8:00 a.m. in the Lyle Confer- <br /> . ante Room, 858 Pearl Street, Eugene, Or- <br /> egon. The Pre-btd meeting win be the ordy <br /> opp0riunity for btddere to review the proj- <br /> <br /> } eat site: Special site visits before at attar <br /> . this meeting wul not be considered. <br /> ' viewed andlor o at the otfweof the <br /> City Engineer, 99 Fast Broadway, Eugene, • <br /> Oregon 57401, for anon-refundable tee of <br /> 515.00 plus 56.50 postage. For other re- <br /> viewing Iocatlons and any questbns re- <br /> garcRng the project please tau (541j <br /> 682-6560, or use our Enpirreering Bid . <br /> Websue www.eugene-orgov/PW to review <br /> Bids ahan~accompanled by a CBrlltled <br /> checEc, cashier's check or bidder's bond <br /> payable to the City of Eugene in an <br /> amount equal to ten percerd of the amorart <br /> • bid Filing of a quenfkaftort quesdCnnaire <br /> .before bidding vn7! not be regr4red. Contin- . <br /> gent or conditional bids will not be rronsld- <br /> • erect for ac~tance. This pubi'~c works im- ~ ' <br /> provement project Is subject to payment of <br /> prevailing rate of wages, per 80U ORS <br /> 2~9c.tiao to 279c.67o. No bW wi6 be re- <br /> ceived or consdered unless the bid con. <br /> tafns a statement by the bidder that prwd- . <br /> stone of ORS 2780.800 to 2790.870 per- <br /> • taining to prevailing wage rates shall be <br /> compiled wfth. <br /> Bidders are required to suborn a <br /> First-Tier Sut>oontractor Discbsure form, - <br /> substantially es descrbed to ORS <br /> '2790.370. Prior to the Bid Cbsing Date <br /> and Time. For this pmjec2 the ftrsttier aub- <br /> contractor disdoaure statement must be <br /> sutxnitted regardless of the bid amount' ' <br /> iV0 bid wdi be accepted by the City <br /> unless it contains a statement by the bid• <br /> der as a part of the bid that the bidder M <br /> • <br /> <br />