New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-02-05 (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-02-05 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 9:22:21 AM
Creation date
6/4/2009 10:10:30 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
POS
Document_Date
3/12/2002
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1920's. Over 2500 feet of concrete walks; a lighting system; two picnic areas and <br />eight acres of irrigated lawn are added. '" ``. <br />1952: A proposal to install television stations on the butte is rejected. <br />1962: A wooden cross with light bulbs (a replacement for the original, neon-lit cross) <br />.:blows down in the Columbus Day storm. <br />1960s: The emergency communications towers are built on top of the butte on the site of <br />the old U of O observatory. <br />1963 The Alpha Phi Omega fraternity decides to erect a 51' high concrete cross as a <br />community service project. Public objection halts progress. However, a large <br />concrete cross is installed mysteriously overnight on the Butte, and subsequent <br />public support allows it to be legalized one month after installation. <br />1967: The Metropolitan Civic Club is formed to research possible uses for Skinner <br />Butte. Many ideas were put forth as a result of a city-wide survey, including <br />tramways, restaurants, high-rise apartments, leveling the butte, keeping vehicles <br />out, or a possible site for OMSI. Most proposals are abandoned partly due to <br />disagreement, lack of funding and difficulties with construction on butte. <br />1967: The main playground and the octagonal restroom are constructed. <br />1968: The park expands westward with the purchase of land and the subsequent removal <br />of buildings. One building remains at 169 N. Washington St. and is subsequently <br />occupied by Child Care, Inc., a child care facility for low-income families. <br />1970: The zoo closes in the park and the last animals are moved out. <br />1971: Lane County presents the City of Eugene with the keys to a new replica of <br />Skinner's Cabin. Oregon Lewis and Clark Chapters of the DAR donate a plaque <br />during a community dedication ceremony. <br />1973: The Eugene Jaycees start the "Buck for the Butte" promotion to cleanup and <br />enhance the Butte. The City Council approves $5000 for butte improvements to <br />match the Jaycees' pledge. A master plan proposal is drafted for the top of the <br />butte and used in subsequent cleanup and restoration efforts. The proposal was to <br />turn the butte into a passive recreation area. with irrigated turf and viewpoints. <br />1973: The old concrete reservoir (1906) is removed as a first step in community- <br />sponsored cleanup operations. <br />1973-1977: The river-front bike path is constructed through the park. <br />~' " <br />
The URL can be used to link to this page
Your browser does not support the video tag.