New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-03-07-F (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-03-07-F (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 9:33:13 AM
Creation date
6/4/2009 9:23:03 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Airport Rule
Document_Date
5/9/2003
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
revision, and local regulations and requirements regarding safety, testing, <br />filtering, inventory management, and quality assurance. <br />5.4.4.2 Permit Application Requirements. Prior to issuance of a permit and <br />authorization from the Airport Manager to commence operations, the operator shall <br />provide the Airport Manager with: <br />(a) Written documentation that the operator has secured any necessary <br />authorization for the self-service fueling facility from the Oregon Department <br />of Aviation; <br />(b) Copies of permits issued by the City for construction and/or <br />installation of the facility; <br />(c) Written approval from the Fire Marshal that the facility meets <br />applicable standards and requirements; and <br />(d) Proof of insurance that meets the minimum requirements set forth <br />in the Self-Service Fuel Facility Permit, with the City named as a co-insured. <br />.5.4.4.3 Self-Service Fueling Facilities. Plans and specifications for the <br />construction and installation of self-service fueling facilities, including all proposed <br />fuel dispensing and storage equipment, shall be approved by the Airport Manager prior <br />to installation, subject to the requirements of these Airport Rules, the following special <br />requirements and conditions of the operating permit: <br />(a) The proposed location for installation of placement of the facility <br />shall be supported by an engineering report that attests to the vertical load of <br />proposed equipment and the ability of the existing infrastructure to support the <br />proposed fuel tank, equipment and related structures at capacity; <br />(b) Fuel tanks shall have a minimum capacity of five thousand (5,000) <br />gallons, and a maximum capacity of twelve thousand (12,000) gallons, and <br />shall be kept full- enough to meet customer demand at all times; <br />(c) Fuel dispensing equipment shall meet all applicable fuel distributor <br />requirements; <br />(d) At a minimum, a canopy designed to protect customers from <br />inclement weather shall be erected over the self-service dispensing pump area; <br />(e) The self-service fuel facility shall have a lit sign for demarcation, <br />which shall be approved by the Airport Manager prior to installation; and <br />(f) The facility shall be well lit and equipped with a telephone and <br />calling instructions for use by customers to report emergencies and equipment <br />malfunctions. <br />5.4.4.4 ~ Self-Service Fueling Operations. <br />(a) The method and route to be used by fuel delivery vehicles shall be <br />subject to prior approval and modification by the Airport Manager. <br />(b) Self-service fueling equipment shall be repaired within 24 hours of <br />an operator's receipt of notification of a malfunction. <br />(c) The operator shall demonstrate compliance with equipment and <br />environmental compliance requirements set forth in the self-service fuel facility <br />permit. <br />Administrative Order - 16 <br />r:\adminord\rules\03airrl2ao.wpd(OS/16/03) <br />
The URL can be used to link to this page
Your browser does not support the video tag.