New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-95-08-F (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-95-08-F (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:05:32 AM
Creation date
6/3/2009 10:19:43 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
7/26/1995
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table 1 <br />ATTACHME~fT #2 OF EXHIBIT A <br />.SUMMARY OF SYSTEMS .DEVELOPMENT. CHARGES <br /> Transportation Sanitary Seiner Storm Seiner Parks <br />Rates Cost per trip = Cost per Equivalent Cost per square foot of Cost per Dwelling <br /> $511.02 Dwelling Unit (EDU) = impervious surface~azea = Unit = $594.07 <br /> $548.78 pocal) and $0.123. Cost per dwelling <br /> $300.00 (regional). unit =$395.28 or $592.93 <br /> Plumbing Fixture Unit depending on building size. <br /> (PFU) costs aze $34.30 Basic dwelling unit cost <br /> (local) plus $18.75 computed based upon <br /> (regional). System assumed 35% impervious <br /> connections in RR/SC and area on 9200 sq, ft. lot. <br /> Hwy 99 areas will pay <br /> $0.025 per square foot of <br /> lot area. <br />Cost Basis Non-assessable cost Estimated non-assessable Estimated non-assessable Unit costs for various <br /> per lane mile for cost of existing system cost of existing system components as <br /> collectors and using costs from using costs from provided by Parks <br /> arterials; costs of "Infrastructure "Infrastructure Replacement Planning. <br /> arterial street lights; Replacement Values Values Report". <br /> cost per mile for off- Report". Charges are net of <br /> street bike paths. all federal grants and <br /> outstanding debt. <br />Service I;evel of Service "D" for Design flow standards Design standards currently Existing levels of <br />Standards roads {675 peak hour currently used by the City used by the City to handle service for various <br /> vehicles per lane). One for various land use types. five-year storm. components as <br /> light per 27 peak hour PFUs are determined using established in the <br /> VMT. 0.196 miles of Oregon State Drainage Parks Master Plan. <br /> off-street bike path per Plumbing Code. <br /> 1.000 people. <br />Classification Improvement Charge Reimbursement charge - Improvement charge Improvement charge <br />of Charge 33% <br /> Improvement charge - 67% <br />Implementa- Charges for roads acid Charges aze on the basis Charges are based on Charges are on a flat <br />tion streetlights would be of EDUs or PFUs. Existing impervious area for all non- rate per dwelling unit <br /> calculated based on commercial development single-family development. _ $594.07 <br /> trip rates for specific connecting for the first For single family <br /> development types time is charged based on development, charge is as <br /> according to Appendix average winter months' follows: <br /> C, using dwelling water consumption, <br /> units, gross floor area, converted to EDUs. Credit SFD w/bldg footprint <3K <br /> or other units. Trip for past.property tax 5q. ft. _ $395.28 <br /> rates capped at 10 payr~,ents will be granted <br /> trips per 1.000 square for regional charge; credit SFD w/bldg footprint >3K <br /> feet or equivalent. for past trunk sewer levy sq. ft. $592.93 <br /> payments will be granted <br /> for local sanitary charge. Duplex = $790.56 <br /> Mobile home parks = <br /> $206.73 based on a per <br /> space charge plus additional <br /> cost per square foot of <br /> impervious area = $0.123 <br />') - Note Administrative costs are not included in the figures above. They will be added to each building permit. <br />The administrative cost is 7.25% of the total SDC (prior to deduction of credit). An additional $i0 MWMC <br />°'- administrative charge will be added to the Sanitary Sewer SDC. <br />n 1 <br />August Ol, i995 Ni~hodologies: city of a SDCs _ 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.