ATTACHMENT #2 OF EXHIBIT A <br />Table 1 <br />SUMMARY OF SYSTEMS DEVEIAPMENT CHARGES <br /> Transportation Sanitary Sewer Storm Sewer Parks <br />Rates Cost per trip = Cost per Equivalent Cost per square foot of Cost per Dwelling <br /> $511.02 Dwelling Unit {EDU) = impervious surface area = Unit = $594.07 <br /> $548.78 (local) and $0.123. Cost per dwelling <br /> $300.00 (regional). unit = $395.28 or $592.93 <br /> Plumbing Fixture Unit depending on .building. size. <br /> (PFU) costs are $34.30 Basic dwelling unit cost <br /> {local) plus $18.75 computed based upon <br /> (regional). System assumed 35% impervious <br /> connections in RR/SC and area on 9200 sq. ft. lot. <br /> Hwy 99 areas will pay <br /> $0.025 per square foot of <br /> lot area. <br />Cost Basis Non-assessable cost Estimated non-assessable Estimated non-assessable Unit costs for various <br /> per lane mile for cost of existing system cost of existing system comporents as <br /> collectors and using costs from using costs from provided by Parks <br /> arterials; costs of "Infrastructure ~ "Infrastructure Replacement Planning. <br /> arterial street lights; Replacement Values Values Report". <br /> cost per mile for off- Report". Charges are net of <br /> street bike paths. all federal grants and <br /> outstanding debt. <br />Service Level of Service "D" for Design flow standards Design standards currently Existing levels of <br />Standards roads (675 peak hour currently used by the City used by the City to handle service for various <br /> vehicles per lane). One for various land use types. five-year storm. components as <br /> light per 27 peak hour PFUs are determined using established in the <br />- VMT. 0.196 miles of Oregon State Drainage Parks Master Plan. <br /> off-street bike path per Plumbing Code. <br /> 1.000 people.. <br />Classification Improvement Charge Reimbursement charge - Improvement charge Improvement charge <br />of Charge 33% <br /> improvement charge - 67% <br />Implementa- Charges for roads and :Charges are on the- basis Charges are based ion ` . ` Charges are on a flat <br />tion streetlights would be of EDUs or PFUs. Existing impervious area-for all non- .rate per dwelling unit <br /> calculated based on commercial development single-family> development. _ $594.07 <br /> trip rates for specific connecting for the first For single. family <br /> development types -time is charged based on development, charge is as <br /> according to Appendix average winter months' follows: <br /> C, using dwelling water consumption. <br /> units, gross floor area, converted to EDUs. Credit SFD w/bldg footprint <3K <br /> or other units. Trip for past properly tax sq. ft. _ $395.28 <br /> rates capped at 10 payments will be granted <br /> trips per 1.000 square for regio~ial charge; credit SFD w/bldg footprint >3K <br /> feet or equivalent. for past trunk sewer levy sq. ft. $592.93 <br /> payments will be granted <br /> for local sanitary charge. Duplex = $790.56 <br /> Mobile home- parks _ <br /> $206.73 based on a per <br /> space charge plus additional <br /> cost per square foot of <br /> impervious area = $0.123 <br />Note Administrative costs afire not included in the figures above. They will be added to each building permit. <br />The administrative cost is 7.25% of the total SDC (prior to deduction of credit). An additional $10 MWMC <br />administrative charge will be added to the Sanitary Sewer SDC. <br />.TUNE 5, 1995 METHODOLOGIES: CITY OF EUGENE SDCS PAGE 6. <br />