AMENDMENTS <br />. TO <br />CITY OF EUGENE, ENGINEERING DIVISION, PUBLIC WORKS DEPARTMENT <br />SYSTEMS DEVELOPMENT CHARGE METHODOLOGfES <br />EFFECTIVE, FEBRUARY, 1.993 <br />ATTACHMENT #1 OF EXHIBIT A <br />COMPLETE COPIES OF THE FULL METHODOLOGY ARE AVAILABLE FOR INSPECTfON AT THE ', <br />FOLLOWING LOCATIONS: <br />Public Works Department The Eugene Public Library <br />858 Pearl St. Lobby 100 West 13th'Ave <br />Tlme Pemmit and Information Center City Hall <br />NEW LOCATION:. Atrium Building 777 .Pearl St. <br />99 West 10th Ave <br />BASED ON THE ENGINEERING NEWS-RECORD PUBLICATION, THE FOLLOWING CHANGES 1MLL BE MADE, EFFECTIVE AUGUST 01, 1995. THE <br />PROPOSED CHANGES REPRESENT THE CUMULATIVE INCREASE IN CONSTRUCTION COSTS OF 2.8 % + 3.7% in 1993, 5.8% in 1994, and 2.65% <br />PROPOSED I N 1995: <br />,~ <br />PREVIOUS -Effective date 711/92 - 3J1/93 <br />PAGE LOCATION (Subsequent Administrative Orders addressed the annual inflation changes) PROPOSED -Effective August 1, 1995 <br />1 Section 1.0 (¶ 4) 'The figures used in.... described in paragraph 2.2 below." Paragraph replaced by'The figures used in the appendices <br />-are those which appeared in the May 1991 adopted <br />Methodologies. They do not agree with the current fee <br />schedule, The 1991 figures have been increased 2.8% in <br />1992, 3.7% in 1993, 5.8% in 1994, and 2.65% in 1995." <br />6 Table 1 Current Table to be removed Table replaced, (see attachment 2) <br />10 Section 3.0 (¶ 3) Transportation System Charge per trip = $453.75 Charge. replaced, per trip = $511.02 <br />PAGt ~ OF 2 <br />