METH®DOLOGYe <br />City of Eugene Systems Development Charges <br />Appendix G <br />May 1, 1997 <br />1.0 <br />1.2 Transportation System Cost of Service [add cost per trip for: street system ($475.374) <br />+ street system lighting ($122.072) + bicycle path system ($60.56) + bicycle path system <br />lighting ($7.49) =total cost per trip ($665.49)]: <br />1.2.1 Street System Cost of Service <br />Formula: <br />,,: <br />Miles per trip <br />)C Cost,per lane mice - Gost per trip <br />Capacity per lane mite <br />Calculation: <br />0.7665 <br />X $4,300` _ $122.07 (per trip) <br />27 ($475.374 + $122.672 = $597.45) <br />May 1, 1997 City of Eugene SDC Methodology Page G-1 <br />Formula and Calculation Details <br />1.1 General Rate Setting, Cost of Service Formula: <br />1.2.2 Street Light System Cost of Service <br />Formula: <br />