FIGURE 2 <br />TRANSPORTATION SYSTEM <br />'~~ <br />STREETS <br />Level of Service <br />LOS D as specified <br />,j in TransPlan ~ System Value <br />Impact measurement Non-assessable <br />construction cost <br />D Tri s enerated <br />p g er lane mile <br />p <br />D Vehicle mile traveled <br />Formula: <br />Cost of Service (PER TRIP) <br />Miles per trip Cost Cost <br />X per = per <br />Capacity per ,lane mile lane mile trip <br />Note: The cost per trip, can be found in the current adopted SDC fee schedule in Appendix G. <br />,. <br />May 1, 1997 City of Eugene SDC Methodology. Page C-4 <br />,_ <br />__ <br />