New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-02-F-2
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-02-F-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:30:05 AM
Creation date
6/3/2009 9:14:16 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
4/30/1997
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. „ ', <br />2.3 fiAuto~tatiej Annual:Adjustment to SDC <br />2.3.1 Inflation Adjustment For All City System`Charges <br />Because the. SDC and supporting calculations including the credits established herein are <br />closely related to the cost of construction of the capital improvements for each of he <br />systems, except as provided in .paragraphs, 2.3.2 and 2.3.3 hereof, the SDC 'and <br />calculations for each City system shall be farato,~rrattcallyj adjusted annually during the <br />month of fern-tEie-ftrst--day-of] July of each calendar year unless otherwise amended as <br />provided herein. .Except when the charge or credit is determined by another provision of <br />the Eugene Code, 1971, the City. Engineer shall make the adjustment based upon currerrf <br />' project costs the National Construction Cost Index published. by Engineering News <br />Record (ENR), and other local or regional data: eentage <br />letrlate-th The <br />supporting;-documentation, tables, antl'figures-will be part of the annual adjustment <br />. process and will be,updated without administrative notice or hearing by the City <br />. Manager or manager`s designee; <br />2.3.2 Inflation Adjustment For Regional System Charges <br />The Regional Facilities Equalization charge established. in cooperation with the MWMC <br />shall be adjusted from time to time to atlow for inflation, after consultation with` fonder <br />t-he-dirteetton-efj MWMG without notice or hearing by~the City Manager or manager's <br />designee. <br />2.3.3 lriflation A~f~ustmen# For ;River Road/Santa:. C1araJHighway 99 Area ~tty <br />System Charges ,.. . . <br />The Local f:ra-ni#ary- Sewer] ~Nast~rwater System portion of the <br />Wastewater.System charge for River Road/Santa ClaralHighway 99 areas shall remain at <br />2.5 cents per square foot cif parcel being developed, whether or not the property is <br />incorporated tntQ #he'City, ::until modified by amendment of these Methodologies. <br />' Attachment #2; in Appendix D, the; River Road/Santa Clara/Highway 99 Area '- City <br />Wastewater SDC Rate map,: shows the. specific areas that are eligible fdr this <br />alternate SDC calculation ;method. <br />2.4 Expending SDCs - <br />Except. for 33% of the local [sanitaryr-sewer] ,wastewater SDC which is a reimbursement fee and ' <br />except for the administrative costs, the-SDC revenue is a public improvement charge as defined <br />in EC 7.010 and may only be spent on capacity increasing capital improvements or debt related <br />to such improvements. - <br />The capital improvements to be constructed using .SDC revenue appear in the City's long range <br />plans. The City's long-range plansreflect the anticipated facility needs required. toaupport new <br />development. The needs identified in the long-range plans are generally included in the CIP: <br />However, most capital projects require a mix of funding sources. Given the limits on certain <br />funding sources and the need to address existing as well as future needs, the CIP does not <br />Proposed. Methodologies: -City of Eugene, SDCs (Effective. March 01, 1997) Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.