o ( ~ <br />TABLE 2 <br />Potential Impact Reduction and Credits-for• Systems Development Charges <br />**NOTE: List of examples; eligibility depends on compliance with conditions in SDC Policies <br />and Procedures document. <br />1. Transportation System <br />BEDl.~C1L0~1~ <br />Successful bus pass program fior employees <br />CREDITS: - <br />Residential <br />Street widths > 36 Feet <br />CommerciaUlndustriaL <br />Street widths > 44 feet <br />Off--site, non-contiguous intersections for arterial and collector streets <br />Transit shefter,and pullout <br />Street lights on arterial and collector streets - <br />OfF site .right of way. and easements <br />Traffic signals <br />Off-street bicycle paths identified in TransPlan or other City plans. <br />Offsite public improvements where equivalent assessments can be collected <br />2. Wastewater System • <br />CREDITS: <br />Public Wastewater collection lines > 8-inch diameter <br />Public pump stations and pressure lines that serve more than the' development <br />Offsite public sewer improvements, equivalent assessments <br />3. Stormwater System <br />REDUCTIONS: <br />Retention system (e.g: Drywells, infiltration trench) <br />CREDITS: <br />Stormwater collection lines > 24-inch and <_ 60-inch in diameter <br />Major drainage channels: construction and off-site easement <br />• Offsite public improvements where equivalent assessments .can be collected or that, benefit existing <br />developments <br />