New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-07-F (3)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-07-F (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:32:32 AM
Creation date
6/3/2009 8:38:50 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
4/28/1997
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attachment #2 of Exhibit A <br />Administrative OrderNo. 58-97-07-F <br />TABLE 1 Pagelofl <br />SUMMARY OF SYSTEMS DEVELOPMElVT° CHARGES <br /> Transportation Wastewater,city.soc Wastewater.;nrlwnncsoc Stormwater Parks <br /> Cost per trip = Cost per Equivalent Costs are based on the type of land Cost per square foot of Cost per <br /> 5665.49 Dwelling Unit (EDU) use and,.for industrial dischargers impervious surface area = Dwelling Unit = <br /> = 5560.58. Plumbing with process flows, on the strength of x0.148. Cost per single-family 3833.43 <br />H Fixture Unit (PFU) discharge. The rate varies by land development (SFD) with building <br />~; costs are S35.04. System use. The rate for a single residential footprint <3,000 sq. ft. =5475.74, <br />~ connections in -River Road unit is 3277.76. or 23,000 sq. ft. = 5713.61. Rer <br />~ /Santa Clara and Hwy 99 Duplex = 3951.48. For <br /> areas wiil pay 30.025 per Manufactured Home Parks = <br /> square foot of lot area 3249.23 per space plus cost per <br /> square foot of additional <br /> impervious area = 30.148. <br /> Non-assessable Estimated non-assessable The reimbursement portion of the'` Estimated non-assessable cost Unit costs for <br />H cost per lane mile cost of existing system charge is based on the net local of existing system using costs various <br />cNa for collectors and using costs from equity in the regional treatment plant. from 'Infrastructure components <br />m <br />y arterials; costs of "Infrastructure and other regional assets. The Replacement Values Report". <br />H arterial street lights; Replacement Values improvement portion of the charge is <br />e <br />U cost per mile for Report". Charges based on current cost of capacity- <br /> off-street bioyde are net of all federal grants enhancing projects to be constructed, <br /> paths. and outstanding debt. as contained in the current Capital <br /> Improvement Program. <br />vs Level of Service Design flow standards The service standards are secondary Design standards currently used Existing levels <br />~ "D"for roads (675 currently used by the City wastewater treatment for flows as by the City to handle afive-year of service for <br />$ <br />= peak hour vehicles for various land use types. defined in MWMC's operating permit storm.. various <br /> <br />ea per lane). One light PFUs are determined with DEQ, and capacity enhancing components, as <br />N per 27 peak hour using Oregon State capita! improvements as listed in the established in <br />e+ VMT. 0.2268 miles Drainage Plumbing Code. capital improvements plan adopted the Eugene <br /> ~f off street bicycle by the MWMC. Parks and <br />~~ path per 1,000 Recreation <br />~ People. Plan. <br />o Improvement Reimbursement charge The MWMC charge is a combined Improvement charge Improvement <br />~ Charge m 33°,6 reimbursement and improvement fee. charge <br />~ ~ The proportion of the fee that is based <br />yt Improvement charge on capacity enhancing improvements <br />~ c n 67°,6 varies over time as projects are. <br />V identified, funded, and scheduled. <br /> Charges for roads Charges are on the Charges for new development, Basic SFD dwelling unit cost is Charges are <br /> and streetlights basis of EDUs or PFUs. changes in use and =xisting computed based upon assumed based on a flat <br />p would be calculated Existing commercial development connecting for the first 35°,6 impervious area on 9200 rate per <br />' Q based on trip rates development connecting time are based on the number of Flow square foot lot. For SFDs with dwelling unit for <br />~ for specific for the first time is charged Estimation Units (FEUs), times they 23,000 sq. ft., the cost is based all types <br />~ development types based on average winter <br />' cost per unit of measure. A FEU is upon 1.5 times the basic SFD of residential <br />y according to months <br />water based on the size of development; rate. For Duplex development, development. <br />~ Appendix C, using consumption, converted to and the effluent characteristics of the cost is based on 2 times the There is no <br />~ dwelling units, gross EDUs. Credit for past flow, biochemical. oxygemdemand basic SFD rate). The cost charge for <br /> floor area, or other. trunk sewer levy payments and suspended solids for each type for a Manufactured Home Park commercial <br /> units. Trip rates will be granted for the local of Viand use. The charge for changes is computed based on assumed development. <br /> capped at 10arips charge. in use and expansion. of development 1,684 sq. ft. of impervious area <br /> per 1,000 square already connected to the wastewater per leasable space plus the <br /> feet or equivalent. ~ system are based on the net additional cost per square foot of <br /> difference in FEUs created by the ail other impervious surface area. <br /> change or expansion. Credit for past All other developmenYis charged <br /> property tax payments for debt based on actual impervious <br /> service on the regional facilities will surface area or equivalent <br />• <br /> be deducted from the charge. surface area <br />N~ Administration costs are not included in the figures above. They will be added to each building permit. The administrative cost is 5.0°~ ofthe <br />total SDC (prior to deducfion of credit); An additional $10.00 per permit MWMC administrative charge will be added to the MWMC SDC: <br />-July 7, 1997 City of Eugene SDC Methodology Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.