2.0 Adopted SDC Fee Schedule: Current Rates <br />2.1 Transportation System <br />Attachment #8 of Exhibit A <br />Administrative Order No. 58-97-07 <br />Page 3 of 3 <br />Cost per trip :............................•-•--................ .$665.49 <br />2.2 Local Wastewater System: <br />Equivalent Single-family dwelling unit (EDU) ......................... $560.58 <br />Per Plumbing Fixture Unit (PFU) [ 560.58 / 16 ] ..................... $35.04 <br />For Historic Consumption, per 1,000 gallons <br />of average monthly winter water consumption [ $560.58 / 6 ] .......... $93.42 <br />River Road/Santa Clara/ Highway 99 Areas: <br />Per square foot of tax lot area ................................... $0.025 <br />2 S Regional Wastewater System;` <br />Unit Gost by Component: <br />Average Flaw (pergalfon)_ '" $0299. <br />Peak Wet Weather Flow (per galian) $0.664 <br />Biochemical Oxygen Demand (per pound)} $191.Sfl <br />Suspended Solids'(per pr~und}) $148.65 <br />2.4 Stormwater System: <br />Per Single Family Dwelling: <br />With building footprint < 3,000 sq. ft . ............................. $475.74 <br />(Assumes 9,200 sq ft lot; .35 impervious surface) <br />[ 9,200 x 0.35 = 3,200 x 0.148 = $476.00] <br />With building footprint >_3,000 sq. ft. or more ...................... $713.61 <br />(Assumes 1.5 x SFD average impervious surface) <br />[ $475.74 x 1.5 ] <br />Per Duplex (equals two Dwelling Units) .............................. $951.48 <br />Per Manufactured Home Development: <br />.Per space in the development .................................. $249.23 <br />(Assumes 1,684 sq. ft. per space x $0.148) <br />plus per square foot of impervious area for other features ............ $0.148 <br />All Other Development: <br />Per square foot of impervious/equivalent impervious area. ........... $0.148 ' <br />2.5 Parks System: <br />Total charge per person ....................................... $362.36 <br />Total charge per Dwelling Unit (2.3 persons x $362.36) .............. $833.43 <br />2.6 Administration Fees: <br />City of Eugene per total SDC charges ............................ 5.0% <br />(Based on the gross SDC charge) <br />MWMC per permit application ................................... $10.00 <br />2.7 Appeal Fee: <br />City of Eugene per SDC appeal ................................. $100.00 <br />Proposed: July 7, 1997 City of Eugene SDC Methodology Page G~ <br />