New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-07-F (3)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-07-F (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:32:32 AM
Creation date
6/3/2009 8:38:50 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
4/28/1997
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attachment #6 of Exhibit A <br />Administrative Order No. 58-97-07 <br />Page 3 of 3 <br />Physical Improvements (for impact reduction/mitigation): A facility or asset, designed and <br />constructed at the developer's expense, which is owned and maintained by the property owner or <br />owner's agent; not a program or activity or naturally occurring physical attribute. <br />Proportionate Share of Public Facility Costs: The cost of capital improvements which are <br />reasonably attributable to new development. <br />PFU: Plumbing Fixture Units. PFUs are defined in the state Uniform Plumbing Code. A rating <br />assigned to different drainage fixtures depending on drain pipe or fixture size. <br />Peak Flow: For purposes of the MetropotitanWastewater Management Coixtniission SDC, peak flow <br />is the peak wet weather design; capacity of the regional wastewater treatment plant.: <br />Process Wastewater: Water which, during;manufacturirtg or processing, comes into contact with <br />or:resuits from thee.-.production of or use of any raw material, intermediate product, finished product <br />_.. <br />byproduct or waste producf. <br />Reimbursement Fee: The portion of the system-specific SDC charged to recoup the community's <br />past or current investment in extra capacity in anticipation of future growth. An example is the facility <br />charge established by MWMC to recoup the regional investment in extra capacity <br />tt'l the wastewater treatment facili <br />{madefi~} '„ ~ tY <br />Replacement Costs: The cost (in current fiscal year dollars) of replacing existing system capacity. <br />SS: Suspended Solids The total eleir~ents and cvmpoiands vYhich :float on .tl7e surfa_ ce'of,~ or are <br />suspended in, wasfewater and whsch'are remQVable:lay laborafory fittratron, expressed in milligrams: <br />per liter. <br />SDC Eligible Costs: System value net of assessable costs, grants and outstanding debt. This cost <br />is allocated to all development in proportion to its impact on system capacity. <br />Single Family Dwelling (SFD): As used in EC 7.725(b) and this methodology, a "single family <br />dwelling" means a "Dwelling, single family detached" as defined in EC 9.015. <br />Unit of Development (Unit):; "For :purposes of '.:the Transportation SDC and the Metropolitan <br />Vllastewater Management Commission SDC, the unit of devefiopmenT is that measurement of the <br />size of a development upon which the ,charge,: is based. '.For the Metropolitan Wastewater <br />Management Commission SDC, the Unit is called an FEU. The Unit is Typically 1,::000 square feet <br />bf building area for mostcommerciat users;`and dwelling units for residential development_ Other <br />rieasures are used; as appropriate for' each, type of developmen#. The units:: for each developrnenT <br />type :are shown for The' Transportation SDC in Table X and for the Metropolitan Wastewater <br />Management Commission SDC°in Table Y <br />Proposed: July 7, 1997 City of Eugene SDC Methodology Page B-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.