Attachment #6 of Exhibit A <br />Administrative Order No. 58-97-07 <br />Page 1 of 3 <br />METHODOLOGY: <br />City of Eugene Systems Development Charges <br />Appendix B <br />DEFINITIONS <br />Administrative Charge: The amount charged to each development to cover the cost of developing <br />the methodologies, providing an annual accounting of system development charge expenditures, <br />implementation and operational costs associated with the SDC program. <br />Acquisition Costs: The indirect or direct amount expended to procure use, possession, rights, or <br />title as related to the construction of public improvements. This cost may be determined by current <br />market experience, or other reasonable and prudent methods approved by the City Engineer. <br />Assessable Costs: The amount of capital improvement costs which are collected through the City's <br />local improvement assessment program as established in City code. This cost has been removed <br />from the total cost of capital improvements in determining the system-specific SDC. <br />"Average Cost" Determination: <br />(1) The average cost of inspecting and installing connections with the wastewater facilities and with <br />- the stormwater facilities, which are not part of the SDC as defined in E.C. 7.010, is the connection <br />permit fee established by the City. <br />(2) If an applicant to connect to a wastewater or stormwater facility would result in extraordinary cost <br />of inspecting and installing the connection, nothing in this definition shall prevent the City from <br />requiring the applicant pay such costs. The extraordinary costs may be paid by the applicant in <br />installments as part of the SDC. <br />Average Flow: The typical average daily flow of development, by type~of land use.. Far {purposes <br />iif calculating the Metropolitan Wastewater Management Commission SDC, this flow is expressed; <br />in terms of a unit of development, <br />BOD: ' Biochemicat'Qxygen Demand. 'The quantity of oxygen utiJized'in the`biochemical oxidation' <br />of organic matter.:. <br />City Manager: City Manager or designee. <br />City Engineer: City Engineer or designee. <br />City Traffic Engineer: City Traffic Engineer or designee. <br />Construction Costs: The cost in current fiscal year dollars for construction of future capital <br />improvements. <br />Proposed: July 7, 1997 City of Eugene SDC Methodology Page $-1 <br />