New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-07-F (3)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-07-F (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:32:32 AM
Creation date
6/3/2009 8:38:50 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
4/28/1997
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attachment #4 of Exhibit A <br />Administrative Order No. 58-97-07 <br />Page 2 of 2 <br />Commission. On May 15, 1997, the Commission adopted the fRegianalj <br />-- <br />MWMC' " Systems Development Charge which includes a regional <br />administrative charge. In accordance with the agreement, the City of Eugene must adopt rates <br />and charges not less than those required by the Commission. <br />The IVIWMC SDC (also'Icnown as the Regional Wastewater SDC) <br />' formu}a is based on.the allocation of costs of existing or <br />planned capacity to Average Flow, Peak Flow, Biochemical Oxygen Demand (BOD) and <br />Suspended Solids (SS) componen#s of the regional facilities. These cost allocationsare used <br />to derive a cost per Flow Es#imation Un"rt (FEU}, for each type: of land use. The Regional <br />Wastewater SDC is determined by multiplying the applicable FEU.. rate per unit of measure fnr <br />a specific land use type, by the units of measure for the proposed development. The Regional <br />Wastewater system Cost of Service formula per unit. of development can be found in,Appendix <br />D. The Regional Wastewater SDC rates can be found in the current adopted fee schedule <br />in Appendix G. <br /> <br /> <br /> <br /> <br /> <br />~~ <br />The Regional Wastewater SDC Methodology 'provides that a review `of the Capital <br />Improvement Plan(CIP}-:will be initiated at`such time as any single development with an <br />anticipated discharge of 1t)O,Q~Q gallons per, day or more., applies fora building permit or for <br />connection to the system. The purpose of this review is todetermine if the demand placed on <br />the regional system by that new user will require` a change in' the timing of future capita! <br />projects that wiH impact the amount of the Regional SDC: If this occurs, the .improvement fee <br />portion of fhe charge will be modified to reflect fhe value of the new schedule of capacity. <br />increasing improvements, and the modified fee willbe applied #o the development that caused <br />fhe need for the modification and #o all future development. <br />Proposed: July 7, 1997 City of Eugene SDC Methodology Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.