New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-07-F (3)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-07-F (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:32:32 AM
Creation date
6/3/2009 8:38:50 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
4/28/1997
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'Attachment #6 of Exhibit A <br />..Administrative Order No. 58-97=07-F <br />Page 1 of 3 <br />METHODOLOGY: <br />City of Eugene Systems Development Charges <br />Appendix B _ <br />DEFIMTIONS <br />Administrative Charge: The amount charged to each development to cover the cost of developing <br />the methodologies, providing an annual accounting of system development charge expenditures, <br />implementation and operational costs associated with the SDC program. <br />Acquisition Costs: The indirecf or direct arrtount; expended to procure use,, possession, rights, or <br />title as related to the constnaction ofpublic improvements. This cost may be determined by current <br />' ~ market experience, or other reasonable and prudent methods approved by the City Engineer. <br />Assessable Costs: The amount of capital improvement costs which are collected through the City's <br />local improvement assessment program as established in City code. This cost has been removed <br />from the total cost of capital improvements in determining. the system-specific SDC. <br />"Average Cost" Determination: <br />(1) The average cost of inspecting and installing connections with the wastewa#er facilities and with <br />the stormwater facilities, which are not part of the SDC as defned in E.C. 7.010, is the connection <br />permit fee established by the City. <br />(2) If an applicant to connect to a wastewater or stormvvater facility would result in extraordinary cost <br />of .inspecting and .installing the connection, nothing in this definition shall prevent. the City from <br />requiring the applicant pay such costs. The extraordinary costs may be paid by the applicant in <br />.installments as part of the SDC. ; <br />Average Flow: The typical average daily flow of development, by type of land use.. For purposes <br />-' of calculating'the Metropolitan Wastewater Management Commission SDC; this flow is expressed <br />in terms of a unit of development. <br />BOD:. Biochemical Oxygen Demand. The quantity of oxygen utilized in the biochemical. oxidation <br />of organic matter. <br />City Manager: City Manager or designee. <br />.City Engineer: City Engineer or designee. <br />City Traffic Engineer: -City Traffic Engineer or designee. <br />. Construction Costs: The cost in current fiscal year dollars for construction of future capital <br />improvements. <br />. July 7, 1997 City of Eugene SDC. Methodology Page B-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.