New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-13 (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-13 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:34:29 AM
Creation date
6/3/2009 8:35:34 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
POS
Document_Date
7/28/1997
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
H. A third public meeting was held on Apri124; 1997 at the Public Works Maintenance <br />Facility, to receive comments on revisions to the draft development plan. Two separate design <br />options were presented to the public. The handling of vehicular (public and emergency) access <br />.into and through West Alton Baker Park was the major difference between the two design <br />options. Notice of the meeting was mailed to all 118 people now on the interested party list. <br />Notices of the meeting were posted in the park, a news release was issued, and an ad was placed <br />in the local newspaper. A summary of the comments from that meeting is attached as "Exhibit <br />,D» <br />L Responding.to concerns over vehicular access; parking, and to a lesser extent, <br />regarding modifications near existing facilities, such as WISTEC and Cuthbert Amphitheater, <br />staff prepared a revised development plan for public review: Following another news, release and <br />notice to interested parties, a fourth meeting was held at the Public Works Maintenance .Facility <br />on June 4, 1997 to take public comment. The concensus among all present was that the plan <br />presented was responsive to. the testimony and it was very good... Critics of earlier versions <br />voiced their support for this latest draft development plan. Minutes taken at this fourth.meeting <br />are attached as "Exhibit E." <br />J. A complete record of all written and oral testimony is maintained in the :Public <br />Works Maintenance, Parks Planning office. <br />K. `Except as noted above; no further written or oral,testimony has been received <br />following the hearing. <br />L. IVlinor adjustments were made to the development plan in response to comments <br />received at the fourth meeting. Afinal-version of the. West Alton Baker Park Development Plan <br />is attached as "Exhibit E." <br />M. The Plan, presented in graphic form, is conceptual. The exact locations of various <br />improvements and their design and construction details will be addressed as the time of <br />implementation. <br />N. The attached development plan contains elements. which will require the <br />-amendment or repeal of the .1986 Alton Baker Park Master Plan.. Such elements cannot be <br />implemented until the Master Plan is amended or repealed. <br />O. The entire Alton Baker Park is within the Willamette River. Greenway: A <br />Greenway review and approval :will be required as specified inBugene Code Section 9.260. <br />Administrative Order - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.