y <br />,. <br />.- <br />RIGHT-OF-WAY CUT PERMIT FEES {all new): <br />Annual "Blanket" Permits: <br />Processing. <br />Inspection <br />Individual Permit Costs: <br />Joint trench <br />Street Type <br />Projects less than 100 ft. <br />Projects from 100 to 499 ft. <br />Projects from 500 to 100 ft. <br />Projects 1000 ft. and greater <br />$400.00 per permit <br />$ 50.00 per each <br />Provider activity <br />1 Facili 2 Facilities 3 Facilities 4 Facilities <br />local arterial local arterial local arterial local arterial <br />$165 $200 $100 $120 $80 $95 $70 $85 <br />$210 $255 $125 $155 $100 $120 $85 $105 <br />$275 $335 $165 $200 $125 $155 $110 $130 <br />$360 $450 $215 $265 $165 $205 $140 $175 <br />NOTES: <br />1. Costs designated are for each facility within the joint trench. <br />2. The option of applying for an annual blanket permit is only available to Providers Franchised <br />or Licensed by the City. <br />3. Providers have the option of obtaining individual right-of--way cut permits for each excavation <br />activity performed within the right-of-way or of obtaining an annual blanket permit which <br />covers many activities associated with maintenance and minor installations within the right-of- <br />way. The regulations pertaining to the annual blanket permit program are contained within the <br />administrative rules R-7.302-A-2. <br />4. Individual Permit Costs for collector streets and alleys are to be charged the same as local <br />streets. <br />5. Individual Permit Costs for Public Utility Easements (PUE) abutting street right-of--way shall <br />be charged at the same rate as if the placement had been in that right-of--way. PUEs not <br />abutting street right-of--shall way shall be charged at the rate for local streets. <br />Other: <br />Exception permit for cutting street less than five years old <br />Exhibit C - 2 <br />