In addition, the permittee shall be responsible for promptly removing and cleaning all <br />excess earth, stone, crushed rock, rubbish, debris and any unused material that result <br />from work performed. As work progresses; all public ways shall be thoroughly cleaned of <br />all rubbish, excess earth, rock, and other debris resulting from such work. All cleanup <br />shall be at the expense of the permittee. Upon failure to do so, within 48 hours of <br />notification, the City may perform the work and charge the cost thereof to the permittee. If, <br />in the judgement of the Maintenance Planning Manager, a hazardous or dangerous <br />condition exists that affects the public health, safety and welfare, the notification require- <br />ment may be waived and the City may take necessary corrective action to remove the <br />hazardous conditions and charge the costs thereof to the responsible party without prior <br />notification. EC 7.307 (2) <br />Upon completion of the proposed work, the work site and all disturbed landscaping shall <br />be restored to a condition as near as possible to that which existed immediately prior to <br />the work. <br />3.J DAMAGE TO EXISTING FACILITIES <br />The permittee shall be responsible for all damage to public or private property resulting <br />from the permittee's failure to properly protect property while carrying out the work. EC <br />7.297 (2) <br />The Utility Inspector and the owner of any damaged facility must be immediately notified of <br />damage to public or private facilities caused or found by the permittee. When private <br />sewer lines are damaged the permittee shall immediately notify the City Building Sewer <br />Inspector of the Public Works Maintenance Planning Section (682-4800). Required <br />repairs shall meet the State of Oregon Plumbing Specialty Code and be inspected by the <br />Building Sewer Inspector. The Building Sewer Inspector shall make note,.on the City's <br />sewer connection records, of the damage and of the permittee responsible for the <br />damage. <br />The permittee shall exercise care to avoid disturbing or destroying survey monuments. <br />Survey monuments disturbed by the permittee's work shall be restored in conformance <br />with requirements of ORS 209.150. <br />3.J.1 Damage to City Facilities <br />A permittee who causes damage to a City facility during work activities due #o the permit- <br />tee's failure to follow requirements of OAR 952-001-0010 through 952-001-0090 or failure <br />to use reasonable care to protect City facilities shall be responsible for all costs of repair <br />or restoration of .the facility. When a City facility is damaged the permittee. shall immedi- <br />ately notify the Utility Inspector. The Utility Inspector shall submit a damage report and a <br />subsequent repair inspection report to the Maintenance Planning Manager. To aid in the <br />updating of the infrastructure condition records, the damage repair report shall include a <br />measured location and description of the damage and repair. <br />Utility & R/W Permit Policy 24 06/01/97 <br />__ <br />